My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SANTA ANA WATERSHED PROJECT AUTHORITY (SAWPA)
Clerk
>
Contracts / Agreements
>
S
>
SANTA ANA WATERSHED PROJECT AUTHORITY (SAWPA)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2021 10:21:56 AM
Creation date
10/14/2021 10:19:12 AM
Metadata
Fields
Template:
Contracts
Company Name
SANTA ANA WATERSHED PROJECT AUTHORITY (SAWPA)
Contract #
A-2021-185
Agency
Public Works
Council Approval Date
9/21/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 7DOD574C-B1E5-4A94-98CC-C2B16DDD7DC6 <br />EXHIBIT 5 <br />Grant greemen o. <br />Page 24 of 71 <br />Task 11: Construction <br />Construction activities are outlined below. Final design and specifications will determine the detailed <br />information such as length of pipe needed and pump size. <br />11(a): Mobilization and Demobilization: Mobilization will require the contractor to coordinate the location of the <br />site entrance/exit and a staging area where equipment and tools will be kept for each Component. Traffic <br />control may be needed depending on the site. Daily, the contractor will be responsible for securing their <br />staging area, maintaining Stormwater Pollution Prevention Plan (SWPPP) devices, and cleaning the <br />entrance/exit and worksite. At the completion of the components, the contractor will be testing the installed <br />equipment and making any necessary repairs/reinstallation until the testing results are per <br />specification/satisfactory. At the end of construction, the contactor will demobilize by removing all remaining <br />equipment, tools, fencing, SWPPP devices and restoring the worksite per plans. Final paving will be installed, <br />and traffic control devices will be removed. <br />11(b): Construction will include the following components: <br />• WRCRWA 800 Zone Booster Pump Station —The existing recycled water pump station has a 7.2 mgd <br />capacity and will be expanded to approximately 10.7 mgd to deliver recycled water to IEUA's southern <br />system. The contractor will grade the site, excavate for piping, and install the equipment, electrical, <br />instrumentation, and incidentals. <br />• IEUA 930 Zone Booster Pump Station —The contractor will grade the site, excavate for piping and install the <br />equipment, electrical, instrumentation, and incidentals. <br />• 30-inch Transmission Pipeline from WRCWRA Plant to American Heroes Park —During construction, the <br />contractor will excavate a trench, install bedding, piping, and backfill. Compaction testing will be conducted <br />before any paving is installed. Pipe testing will be implemented by the contractor and any defects will be <br />corrected as required. <br />• 24-inch Transmission Pipeline from American Heroes Park to path of construction to 930 PZ at Eucalyptus <br />and Carpenter —During construction, the contractor will excavate a trench, install bedding, piping, and backfill. <br />Compaction testing will be conducted before any paving is installed. Pipe testing will be implemented by the <br />contractor and any defects will be corrected as required. <br />• 930 PZ at Eucalyptus and Carpenter —During construction, the contractor will excavate a trench, install <br />bedding, piping, and backfill. Compaction testing will be conducted before any paving is installed. Pipe testing <br />will be implemented by the contractor and any defects will be corrected as required. <br />Deliverables: <br />• Photographic Documentation of Progress <br />
The URL can be used to link to this page
Your browser does not support the video tag.