My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SANTA ANA WATERSHED PROJECT AUTHORITY (SAWPA)
Clerk
>
Contracts / Agreements
>
S
>
SANTA ANA WATERSHED PROJECT AUTHORITY (SAWPA)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2021 10:21:56 AM
Creation date
10/14/2021 10:19:12 AM
Metadata
Fields
Template:
Contracts
Company Name
SANTA ANA WATERSHED PROJECT AUTHORITY (SAWPA)
Contract #
A-2021-185
Agency
Public Works
Council Approval Date
9/21/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 7DOD574C-BiE5-4A94-98CC-C2Bi6DDD7DC6 <br />EXHIBIT 5 <br />GrantAgreemenWo.4600013842 <br />Page 36 of 71 <br />process screening and alternative analysis, WWTP mass balance model, flood level assessment of Stanfielc <br />Marsh and Big Bear Lake, and implementation plan. The Preliminary Design also includes supporting work: <br />geotechnical investigation, topographic surrey, and a Facilities Plan. The Facilities Plan will provide the <br />overall project concept for use in the development of final design, plans, specifications, and an updated <br />project cost estimate. A Pilot Plant will be built to test the efficiencies of different treatment technologies with <br />the BBARWA WWTP's conditions. Using this data, recommendations for the full-scale upgrades can be <br />made. The 100% design specs will be included with the bid documents. <br />Deliverables: <br />• Geotechnical Report <br />• Topographical Survey <br />• Facilities Plan <br />• Pilot Test Plan <br />• Pilot Test Results Report <br />Task 8: Proiect Monitoring Plan <br />Develop and submit a Project Monitoring Plan per Paragraph 16 for DWR's review and approval. <br />Deliverables: <br />• Project Monitoring Plan <br />Budget Category (d): Construction/Implementation <br />Task 9: Contract Services <br />This task must comply with the Standard Condition D.11 — Competitive Bidding and Procurements. Activities <br />necessary (as applicable) to secure a contractor and award the contract, including: develop bid documents, <br />prepare advertisement and contract documents for construction contract bidding, conduct pre -bid meeting, bid <br />opening and evaluation, selection of the contractor, award of contract, and issuance of notice to proceed. <br />Deliverables: <br />• Bid Documents <br />• Proof of Advertisement <br />• Award of Contract <br />• Notice to Proceed <br />Task 10: Construction Administration <br />This task includes managing contractor submittal review, answering requests for information, and issuing <br />work directives. A full-time engineering construction observer will be on site for the duration of the project. <br />Construction observer duties include documenting of pre -construction conditions, construction log, preparing <br />change orders, addressing questions of contractors on site, reviewing/updating project schedule, reviewing <br />contractor log submittals and pay requests, forecasting cash flow, notifying contractor if work is not <br />acceptable. Upon completing the project, the DWR Certificate of Project Completion and record drawings will <br />be provided to DWR. <br />Deliverables: <br />• DWR Certificate of Project Completion <br />• Record Drawings <br />
The URL can be used to link to this page
Your browser does not support the video tag.