My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REPUBLIC SERVICES
Clerk
>
Contracts / Agreements
>
R
>
REPUBLIC SERVICES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 9:44:48 AM
Creation date
10/28/2021 4:12:07 PM
Metadata
Fields
Template:
Contracts
Company Name
REPUBLIC SERVICES
Contract #
A-2021-171
Agency
Public Works
Council Approval Date
8/17/2021
Expiration Date
6/30/2032
Insurance Exp Date
6/30/2025
Destruction Year
2037
Notes
For Insurance Exp. Date see Notice of Compliance
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
303
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Contractor shall deliver mixed C&D Material loads to the Approved C&D <br />Processing Facility for Recycling. <br />3. Contractor shall deliver Source Separated C&D Material such as, but not limited <br />to, dirt, concrete, wood waste, cardboard, or other Recyclable C&D Materials to <br />the Approved C&D Processing Facility or other Facility authorized for Recycling <br />C&D Material, and shall deliver salvageable materials to a party for reuse or <br />salvage. <br />4. Contractor shall arrange for Processing of Organic Waste in the C&D Material at <br />a Facility that recovers Organic Waste from C&D Material and in a manner <br />deemed not to constitute landfill Disposal pursuant to 14 CCR Section 18983.1(a), <br />which states that landfill Disposal includes final deposition of Organic Waste at a <br />landfill or use of Organic Waste as ADC or AIC. <br />5. If City is not satisfied that the Contractor can achieve and sustain the minimum <br />required annual average Mixed Waste organic content recovery rate, or if the <br />Contractor has implemented its corrective action plan and failed to achieve the <br />minimum required annual average Mixed Waste organic content recovery rate, <br />the City shall have the right to direct use of an Alternative Facility, and <br />Contractor shall incur all costs associated with use of the Alternative Facility <br />including Transportation, Transfer, Processing, and Disposal. The City may <br />assess Liquidated Damages in accordance with Section 11.4 of this Agreement <br />and/or may deem this failure an event of default under Section 11.1 of this <br />Agreement. If an Alternative Facility is not available within a commercially <br />reasonable distance, Contractor shall be required to implement, at no cost to the <br />City and with no increase to rates, an Organic Waste Collection system that will <br />provide programmatic compliance with 14 CCR Division 7, Chapter 12, Article 3. <br />H. Plastic Bags. Contractor shall annually submit to City written notice from the Approved <br />Organic Waste Processing Facility confirming said Facility can remove plastic bags <br />when Processing Source Separated Organic Materials. <br />I. Compostable Plastics. Contractor may accept Compostable Plastics at the Approved <br />Organic Waste Processing Facility. Pursuant to this Agreement, Contractor shall <br />annually submit to City written notice from the Approved Organic Waste Processing <br />Facility confirming said Facility can Process and recover these Compostable Plastics. <br />August 17, 2021 8 - 12 City of Santa Ana <br />
The URL can be used to link to this page
Your browser does not support the video tag.