My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BERG AND ASSOCIATES, INC.
Clerk
>
Contracts / Agreements
>
B
>
BERG AND ASSOCIATES, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2021 9:51:27 AM
Creation date
11/22/2021 9:43:10 AM
Metadata
Fields
Template:
Contracts
Company Name
BERG AND ASSOCIATES, INC.
Contract #
A-2021-212
Agency
Public Works
Council Approval Date
11/2/2021
Expiration Date
11/1/2024
Insurance Exp Date
3/1/2022
Destruction Year
2029
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. The City will require a Critical Path Method (CPM) submittal for said construction <br />schedule as specified within Technical Special Provisions Section 01310 <br />(Construction Schedule). The CPM construction schedule shall be submitted to <br />and approved by the City before any work commences. The Contractor shall <br />schedule their work in order to be as least disruptive as possible to adjacent <br />businesses, residents and the surrounding community. <br />D. Seauence of Construction <br />General: The work shall be carried on in such order of precedence as may be found necessary by the <br />City to expedite completion of the work. When work is begun on any portion or designated part <br />of the project, it shall be carried forward to the final completion as rapidly as practical. <br />As noted in the above Subsection B, work within new City of Santa Ana property and temporary <br />construction easement from Western Exterminator Company will not be able to be started until <br />OCTA has obtained the property/easement and for bidding purposes should be assumed to be in <br />July 2022. <br />As noted in the above Subsection B, work within new easements from Ricoh Company will not <br />be able to be started until OCTA has obtained the easements and for bidding purposes should be <br />assumed to be in July 2022. <br />The following is a tentative work schedule of sequencing the proposed improvements. The actual <br />work will be determined in the field between the City and the Contractor. Items not listed but <br />shown on the plans will be installed at the Contractor's discretion. <br />1. The construction of the bore and jack crossing ofthe SR 55 Freeway shall be completed <br />prior to being able to begin the construction of the relocated SA-7 facility. To <br />coordinate with the Route 55 widening project, it has been assumed that the bore and <br />jack operation within the Ricoh Company property will start in July 2022 and will be <br />completed in four months. In November 2022, SCE will begin the relocation of the <br />power poles within their easement within the vicinity of the bore and jack operation. <br />2. The tentative sequence of construction for the proposed water main construction <br />within Ritchey Street, including the connection of the piping from the relocated SA-7 <br />PRS facility has been summarized on the construction plans. <br />3. The tentative sequence of construction for the proposed water mains on the east side <br />of the freeway has been summarized on the construction plans. <br />4. The existing fire services and new fire hydrants within Ritchey Street shall not be <br />connected to the new 16-inch water main within Ritchey Street (except for the fire <br />service at Station 57+16) until the 16-inch lateral from the new 24- inch line from <br />the relocated SA-7 facility is completed and connected to the existing 24-inch water <br />main. <br />City of Santa Ana RFP 21-066 <br />Page Al-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.