My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BERG AND ASSOCIATES, INC.
Clerk
>
Contracts / Agreements
>
B
>
BERG AND ASSOCIATES, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2021 9:51:27 AM
Creation date
11/22/2021 9:43:10 AM
Metadata
Fields
Template:
Contracts
Company Name
BERG AND ASSOCIATES, INC.
Contract #
A-2021-212
Agency
Public Works
Council Approval Date
11/2/2021
Expiration Date
11/1/2024
Insurance Exp Date
3/1/2022
Destruction Year
2029
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. The existing SA-7 pressure reducing station shall not be taken out of service until the <br />new SA-7 PRS facility is placed into service. <br />6. In order for the contractor of the Freeway Widening Project to construct the proposed <br />8'x4' RCB adjacent to the SA-7 property, no surface site improvements shall be <br />constructed within the temporary construction easement parallel to the freeway, <br />except as shown on the plans. Therefore, the site improvements shall be constructed <br />in Phases (Phase 1 and Phase 2) as is shown on the plans. <br />7. The Freeway Widening Project can not begin the construction of the proposed 8'x4' <br />RCB adjacent to the SA-7 property until the existing SA-7 PRS facility is taken <br />out of service and the new SA-7 facility is operational. <br />8. The Contractor shall assume once the Freeway Widening Project has been notified <br />that the existing SA-7 facility is taken out of service, that the construction of the <br />proposed RCB culvert will take between nine to twelve months. For bidding <br />purposes, the Contractor shall assume that there will a year delay between the Phase <br />1 and Phase 2 site improvement and demolition work. <br />9. The Contractor shall construct the Phase 2 site improvements and the <br />landscape/irrigation improvements once OCTA has provided written notification <br />that the Phase 2 site improvements can be performed. <br />10. It should be noted that MCI will be relocating their fiber optic conduits within <br />Ritchey Street after the City of Santa Ana has completed all of its pipeline work <br />within Ritchey Street. Once their relocation work is completed, OCTA's contractor <br />will overlay the entire width of Ritchey Street through the construction area. <br />E. Public Convenience and Access <br />1. Safe, adequate pedestrian access to all residences, places of business, and other <br />establishments affected by the work, shall be provided and maintained by the <br />Contractor at all times. Unless otherwise shown on the Plans, the Contractor shall <br />maintain and delineate a minimum of one four (4) foot wide pedestrian walkway <br />along each public street at all times during construction. The Contractor shall also <br />place pedestrian detour signs as required if sidewalks will not be able to be <br />maintained during the construction activities. <br />2. The Contractor shall maintain existingpedestrian accesses at intersections at all times. <br />When existing crosswalks are blocked by construction activity, the Contractor shall <br />install signs directing pedestrian traffic to the nearest alternative cross walk. The <br />Contractor shall provide adequate pedestrian crossings at intervals not exceeding <br />350 feet as required, unless otherwise directed by the City. <br />Fencing or other means of securement shall be provided to preclude unauthorized <br />entry to any excavation during all non -working hours on a 24- hour basis including <br />weekends and holidays. Fencing shall be a minimum of seven (7) feet high around <br />the entire excavation and shall consist of a minimum 9-gage chain link type fence <br />City of Santa Ana RFP 21-066 <br />Page Al-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.