Laserfiche WebLink
process lines, as well as the associated normal wet utility lines (such as potable water, storm water <br />and sanitary sewer lines). <br />• Construction Superintendent on a $1.4 million contract to install new water mains, services, and <br />fire hydrants. The construction of this project consisted of the installation of 1,800 linear feet of fl- <br />inch ductile iron mainline pipe, 2,200 linearfeet of 12-inch ductile iron mainline pipe, over 100 new <br />services and 4 fire hydrants. <br />• Project Coordinator for a $5 million multiyear development of reclaimed water system involving <br />modified design build delivery method. Project involved coordination with designers, development <br />of multiple pricing scenarios, and coordination with five public jurisdictions. <br />Foreman, Doty Bros., Norwalk, CA. 1997-2005. Mike performed site utility work for private clients. He <br />was responsible for the installation of water, sewer and storm drain, interpretation of construction plans, <br />documentation of record drawings, managing laborers, record keeping of laborer work hours and <br />organization of daily reports and change orders. <br />• Construction Foreman responsible for $12 million groundwatertreatment plant involvingwell head <br />piping, 5+miles of water transmission piping, concrete facilities, electrical and fiber optic systems, <br />GAC vessels, and mechanical piping systems. <br />• Knott's Berry Farm Soak City Water Park, Buena Park, CA - Construction Foreman for construction <br />of a $2 million sewer collection system (4- to 18-inch), water distribution system (4- to 24-inch), <br />attraction water feed (2-to 16-inch), return systems (12-to 30-inch), site drainage (6- to 30-inch), <br />structural concrete for all attractions (foundations, wave pool, equipment pads, river structure, <br />etc.), and chemical treatment systems for attraction water. Highlights included placement of over <br />4,000 cubic yards of concrete and placement of approximately 300,000 linear feet of piping. <br />Foreman and Laborer, Ken Thompson Inc., Cypress, CA.1985 —1997. Mike worked on projects for public <br />and private entities. He installed PVC, DIP, ACP and steel water mains, VCP and PVC sewer, RCP and box <br />culvert storm drain, performed excavation and compaction, oversaw installation of concrete sidewalk, curb <br />and gutter, driveway approaches, asphalt paving, manholes, junction structures, valves, water services, <br />offsets, fire hydrants, blow -offs, and air vacuum/release assemblies. <br />Construction Foreman for a one-year infrastructure project with 8- to 12-inch sewer, 6- to 18-inch <br />water, 18-to 96-inch storm drains and several dissipating outlet structures. Project utilized multiple <br />shoring methods including, trench shields, hydraulic shoring, and various sloping techniques. <br />Pelican Hills Golf Course, Newport Beach Development, CA- Construction Foreman responsible for <br />proper installation of water, sewer, and storm drains ranging in size from 4- to 84-inch. Pipe <br />included RCP, clay, PVC, and DIP. Project started at below sea level and rose to the elevation of <br />500+.Project utilized various shoring techniques including, trench shields, trench boxes, hydraulic <br />shores, and various sloping techniques. <br />�� Berg & Associates Inc. <br />