Laserfiche WebLink
PATTI FEIST, <br />RELOCATION LEAD <br />25 YEARS IN THE INDUSTRY <br />■EDUCATION <br />COURSEWORK <br />Business, Bismarck State College <br />and College of the Desert <br />LICENSES <br />SENIOR RIGHT-OF-WAY AGENT <br />International Right -of -Way Association <br />REAL ESTATE SALESMAN <br />State of California <br />CA#01810975 <br />NOTARY PUBLIC <br />State of California <br />,QQ AFFILIATIONq <br />. 1�J INTERNATIONAL RIGHT-OF-WAY <br />ASSOCIATION (IRWA) <br />SR/WA, RAC m <br />Patti has been in the right-of-way and real estate services industry for over 25 years. <br />She oversees the planning, management, and the achievement of project objectives <br />within scope and budget. Patti provides coordination and oversight for complex and <br />noncomplex projects involving project cost estimates, waiver valuations, Caltrans <br />certification, acquisition and relocation. Patti is knowledgeable in Federal, State and <br />local laws, regulations, and policies related to eminent domain, easements, rights of <br />entry, real estate title, and other right-of-way technical and legal activities involved <br />with the formal process of acquiring right-of-way. Patti is well known in the industry <br />for her expertise in business relocation. She specializes in business, residential, and <br />mobile home relocation assistance and has relocated hundreds of businesses. <br />E X P E R I E N C E <br />CALIFORNIA HIGH SPEED -RAIL PROJECT <br />California High -Speed Rail Authority I Fresno, CA 1 2016- Ongoing <br />The California Highspeed Rail Authority is responsible for planning, designing, <br />building, and the operation of the first high-speed rail system in the nation. Patti is a <br />key member of the consultant team providing right-of-way support on Construction <br />Package 1, a 23-mile segment between Avenue 19 in Madera County to East <br />American Avenue in Fresno County. She is responsible for the organization and <br />management of an intense utility conveyance and permit process for the Authority <br />preparing and tracking known and unknow utilities and coordination with owners, <br />utilities and stakeholders. <br />METRO GOLD LINE <br />Foothill Extension Construction I Monrovia, CA 12020 - Ongoing <br />As the Relocation Manager, Patti is responsible for the relocation services to <br />residences and businesses affected by the Gold Line extension project in the <br />cities of Arcadia, Monrovia and Glendora. Patti is the liaison between the client <br />and owners and tenant's attorneys and responsible for identification of qualifying <br />compensable items, negotiation of goodwill as applicable, the preparation and <br />review of claims and status reports, relocation claims, and working with contractors <br />to obtain accurate estimates to successfully resolve all relocation issues. <br />1-10 EXPRESS LANES PROJECT — DESIGN BUILD <br />San Bernardino County Transportation Authority I San Bernardino, CA 12018 - 2021 <br />The 1-10 Express Lanes project is a design -build project widening 10 miles of 1-10 <br />from 1-15 to the Los Angeles/San Bernardino County border_ The project includes <br />two toiled lanes in each direct and auxiliary lanes between existing on and off <br />ramps. As a Project Manager, Patti was responsible for many of the complex <br />property acquisitions involving severance damage analysis and mitigation to <br />commercial and industrial properties. <br />1-1O/CHERRY VALLEY BLVD INTERCHANGE PROJECT <br />Riverside Transportation Department I Riverside, CA 12019 - 2021 <br />This project involved the reconstruction of 1-10 at Cherry Avenue Interchange by <br />realigning the on and offrani replacing the existing CherryAvenue Overcrossing, <br />widening of Cherry Avenue from 5 lanes to 7 lanes with sidewalks on both sides of <br />the street. Patti led the team of acquisition agents to acquire the necessary right- <br />of-way for the project and obtain right-of-way certification from Caltrans_ She also <br />provided cost estimating services of probable costs for right-of-way, acquisition <br />and service costs during the environmental planning phase. <br />