My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MONUMENT ROW
Clerk
>
Contracts / Agreements
>
M
>
MONUMENT ROW
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2021 3:42:46 PM
Creation date
12/2/2021 3:40:38 PM
Metadata
Fields
Template:
Contracts
Company Name
MONUMENT ROW
Contract #
A-2021-222
Agency
Public Works
Council Approval Date
11/16/2021
Expiration Date
11/15/2024
Insurance Exp Date
1/1/1900
Destruction Year
2029
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JEREMY NIED, SR/WA <br />SENIOR AGENT <br />20 YEARS IN THE INDUSTRY <br />®EDUCATION <br />ASSOCIATE DEGREE <br />Sierra College, Rocklin, CA <br />eLICENSES <br />SENIOR RIGHT-OF-WAY AGENT <br />International Right -of -Way Association <br />REAL ESTATE SALESMAN <br />State of California <br />CAN01499973 <br />NOTARY PUBLIC <br />State of California <br />AFFILIATIONS <br />- INTERNATIONAL RIGHT-OF-WAY <br />ASSOCIATION (IRWA) <br />Jeremy has more than 20 years experience in the right-of-way and real <br />estate services industry. He is hands-on in his management of acquisition, <br />business and residential relocation assistance, title review, and escrow <br />coordination. Jeremy has worked with a wide range of public agencies <br />and private sector clients with an emphasis on transportation, housing and <br />flood control projects. He is experienced in negotiating with private parties, <br />corporations, and lenders to obtain lender consents and subordination <br />agreements. Jeremy is also experienced in property analysis and valuation. <br />E X P E R I E N C E <br />MULTIPLE ACQUISITION PROJECTS <br />Fresno County Dept of Public Works and Planning I Fresno, CA 12015 - 2019 <br />Auberry and Copper Traffic Signal Project This project consisted of installation of <br />a new four -phase traffic signal with protected left -turn phasing at the intersection of <br />Auberry Road and Copper Avenue- New traffic signal pole foundations and poles <br />were also installed. Auberry Road was widened at the intersection to accommodate <br />left -turn pockets on each approach of the intersection. There were two impacted <br />parcels with two permanent road easements and two temporary construction <br />permits. This project was delivered within budget and on time. <br />Bridge Preventative Maintenace Program Scour Mitigation Project The purpose <br />of the project was to extend the service life of seven existing bridges by installing <br />new scour countermeasures along with other maintenance activities. Permanent <br />maintenance easements were acquired from 14 parcels with 12 owners. Originally <br />the County sought to acquire temporary construction easements, but later decided <br />to pursue permanent easements. This change, along with some project redesigns, <br />caused delays that pushed the project well past its original completion date. Jeremy <br />Nied was sucessful in working with the parties to ultimately move the project to <br />completion. <br />North Avenue Reconstruction Protect From Bethel Avenue to Academy Avenue. <br />This project consisted of improvements to North Avenue including reconstruction <br />of the road surface with hot mix asphalt and aggregate base, construction of <br />sidewalks, curb ramps, cross walks, curbs and gutters, storm drain construction <br />and other miscellaneous improvements. Redesigns required creation of revised <br />offer packages. There were five permanent easements from We owners- This <br />project was delivered on time and within budget. <br />Outside Main Canal Bridge on Russell Avenue Project. This project replaced the <br />hydraulically inadequate Outside Canal Bridge with anew bridge that meets current <br />standards and accommodates ground subsidence and satisfies Central California <br />Irrigation District (CCID) requirements. There were Temporary Construction Permits <br />acquired for six parcels, with a total of three owners. Jeremy sucessfully delivered <br />this project within budget and on time. <br />
The URL can be used to link to this page
Your browser does not support the video tag.