My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BUCKNAM INFRASTRUCTURE GROUP, INC.
Clerk
>
Contracts / Agreements
>
B
>
BUCKNAM INFRASTRUCTURE GROUP, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2021 4:11:11 PM
Creation date
12/2/2021 4:09:52 PM
Metadata
Fields
Template:
Contracts
Company Name
BUCKNAM INFRASTRUCTURE GROUP, INC.
Contract #
A-2021-211
Agency
Public Works
Council Approval Date
10/19/2021
Expiration Date
10/18/2023
Insurance Exp Date
9/16/2022
Destruction Year
2028
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Understanding of Need / Scope of Work <br />Project Understanding / Approach <br />We have defined detailed phases to the scope of work in accordance to the City's RFP; <br />1. Management and Administration <br />a. Project Status Meetings —Quality Control Program <br />b. Client Satisfaction / Project Deliverables <br />2. Pavement Condition Surveys <br />3. Budget Analysis <br />4. Final Report (Internal City CIP / OCTA Compliance Reporting) <br />1) Project Implementation (MPAH Network) <br />TASK 1.1: Database Update <br />Bucknam will review all available City Circulation Element and OCTA Master Plan of Arterial <br />Highways (MPAH) functional classifications to ensure that all sections within the StreetSaver <br />database are consistent with the City Circulation Element & OCTA MPAH designations. <br />Deliverable: Citywide street classification verification report and GIS map <br />TASK 2.1: Management and Administration <br />Building upon our previous successful Santa Ana PUP projects, Bucknam will implement the key <br />first step of an effective pavement management program; frequent communication and timely <br />scheduled data updates Our team will set a Project Kickoff meeting to further discuss and <br />review in detail the expectations of the project, StreetSaver use and status, technical approach, <br />boundary section verification, section ID management & surveys, Orange County Transportation <br />Authority (OCTA) compliance, finalization of the scope of work, review of schedule, format of <br />deliverables and clarification responsibility of each party. <br />This effort will build consensus between the Street Maintenance and Engineering departments <br />as well as build stronger ARTERIAL and LOCAL maintenance programs. The first key topics to be <br />discussed will include the review and assessment of the existing StreetSaver pavement <br />plan/data, OCTA compliance, and survey areas based on recent maintenance work and <br />schedules, new construction, data quality and condition, current pavement procedures, <br />historical expenditure levels, and desired service levels. <br />Project Status Meetings - Quality Control Program <br />Status Meetings and Progress Reports <br />• Minimum of three meetings during the project (kickoff, field, and status <br />meetings)— minimum of eight (8) hours; <br />• Field review meetings; <br />3-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.