Laserfiche WebLink
Understanding of Need / Scope of Work Lip <br />Our OCTA PMP submittals have been well received by OCTA and are formatted in such a way for <br />easy review and acceptance. Our staff will include within the draft/final report the following <br />minimum data: <br />I. Pavement Management Plan Certification <br />II. Executive Summary <br />III. Background (Santa Ana PMP) <br />IV. Current Pavement Conditions (PCI) <br />V. Projected Pavement Conditions (PCI) <br />VI. Alternative Funding Levels <br />• Maintain Existing Average Network PCI <br />• Improve Average Network PCI <br />VII. Current and Projected Backlog by Year of Pavement Maintenance Needs <br />Vill. Centerline Mileage <br />IX. Percentage of Network in Each of Five Condition Categories Based on Centerline mileage <br />X. Reduction in M2 Local Match <br />XI. Appendix A — Seven -Year Road Maintenance and Rehabilitation Plan Based on Current <br />or Expected Funding Level <br />XII. Appendix B — Complete Street Listing Current Conditions <br />XIII. Appendix C —Quality Assurance / Quality Control Plan <br />• Introduction <br />• Objectives <br />• Structure of QA/QC Plan <br />• Condition Survey Procedures <br />• Accuracy Required for Data Collection <br />• Random and Systematic Re -Inspections <br />• PCI Comparison with Past Surveys <br />• Inspector Qualifications and Experience <br />• Safety Procedures <br />XIV. Appendix D — Pavement Management Data Files <br />We will make a presentation of the results from the 2021 PMP update to City personal and/or <br />City Council if necessary (pro-bono). <br />Registered Engineer <br />Mr. Steve Bucknam, P.E., will review all completed data and prepare and sign a final report <br />incorporating the results of our pavement evaluation and conditions. We will provide <br />engineered recommendations for pavement rehabilitation and replacement design based upon <br />field data and analysis. <br />Deliverable: Digital file on DVD, one (1) hardcopy of the Final Pavement PMP, in binder and <br />electronic form (.pdf), will be sent to the City. Bucknam will provide one (1) verified copy of <br />StreetSaver database on DVD as well as all M&R, survey and budget analysis data. <br />3-8 <br />