My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BUCKNAM INFRASTRUCTURE GROUP, INC.
Clerk
>
Contracts / Agreements
>
B
>
BUCKNAM INFRASTRUCTURE GROUP, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2021 4:11:11 PM
Creation date
12/2/2021 4:09:52 PM
Metadata
Fields
Template:
Contracts
Company Name
BUCKNAM INFRASTRUCTURE GROUP, INC.
Contract #
A-2021-211
Agency
Public Works
Council Approval Date
10/19/2021
Expiration Date
10/18/2023
Insurance Exp Date
9/16/2022
Destruction Year
2028
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Understanding of Need / Scope of Work Lip <br />Our OCTA PMP submittals have been well received by OCTA and are formatted in such a way for <br />easy review and acceptance. Our staff will include within the draft/final report the following <br />minimum data: <br />I. Pavement Management Plan Certification <br />II. Executive Summary <br />III. Background (Santa Ana PMP) <br />IV. Current Pavement Conditions (PCI) <br />V. Projected Pavement Conditions (PCI) <br />VI. Alternative Funding Levels <br />• Maintain Existing Average Network PCI <br />• Improve Average Network PCI <br />VII. Current and Projected Backlog by Year of Pavement Maintenance Needs <br />Vill. Centerline Mileage <br />IX. Percentage of Network in Each of Five Condition Categories Based on Centerline mileage <br />X. Reduction in M2 Local Match <br />XI. Appendix A — Seven -Year Road Maintenance and Rehabilitation Plan Based on Current <br />or Expected Funding Level <br />XII. Appendix B — Complete Street Listing Current Conditions <br />XIII. Appendix C —Quality Assurance / Quality Control Plan <br />• Introduction <br />• Objectives <br />• Structure of QA/QC Plan <br />• Condition Survey Procedures <br />• Accuracy Required for Data Collection <br />• Random and Systematic Re -Inspections <br />• PCI Comparison with Past Surveys <br />• Inspector Qualifications and Experience <br />• Safety Procedures <br />XIV. Appendix D — Pavement Management Data Files <br />We will make a presentation of the results from the 2021 PMP update to City personal and/or <br />City Council if necessary (pro-bono). <br />Registered Engineer <br />Mr. Steve Bucknam, P.E., will review all completed data and prepare and sign a final report <br />incorporating the results of our pavement evaluation and conditions. We will provide <br />engineered recommendations for pavement rehabilitation and replacement design based upon <br />field data and analysis. <br />Deliverable: Digital file on DVD, one (1) hardcopy of the Final Pavement PMP, in binder and <br />electronic form (.pdf), will be sent to the City. Bucknam will provide one (1) verified copy of <br />StreetSaver database on DVD as well as all M&R, survey and budget analysis data. <br />3-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.