My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AGENDA PACKET_2021-12-07
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
12/07/2021 Regular
>
AGENDA PACKET_2021-12-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2021 2:13:26 PM
Creation date
12/6/2021 5:43:05 PM
Metadata
Fields
Template:
City Clerk
Date
12/7/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1414
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Generation of Solar Power at Garthe and West Pump Station Facilities Project <br />Bureau f Reclamation Water Energy and Efficiency Grant F <br />emissions. In doing so, the Project addresses this adaptation strategy specifically <br />identified in the completed Watersmart Basin Study. <br />U5.2. Subcri erion 112 .......... Readiness te) Proceed <br />Identify and provide a summary des�cription of the major tasks necessary to complete the <br />project. Note please do not, repeat, the more detailed technical project description <br />provided in Section D.2.2.4.1-this section should focus on a summary of the major, tasks to <br />be accomplished as part- of the project. <br />1. City of Santa Ana Building Dept. to issue appropriate building permits. <br />2. Southern California Edison (SCE) to approve plans and issue permit. <br />3. City staff to implement Public Bid process to determine the lowest responsible bidder, in <br />compliance with State of California Public Contracts Code. <br />4. Santa Ana City Council to award construction contract (to the lowest responsible <br />bidder). <br />5. City will manage the project during construction phase. <br />6. Grant Compliance: The City of Santa Ana has professional grant consultants on contract <br />that will utilize to assure all the Bureau of Reclamation requirements are met in a timely <br />manner. <br />4 Describe y permit's that' Will be required, ak)ng With the pn'xess for obtaining such <br />Following permits will be required: <br />• City of Santa Ana Building Department permit <br />• SCE permit <br />0 Iden tify and describe any engineering or design Work perform ed specifically in support of <br />the proposed project. <br />Newcomb Anderson McCormick (NAM), a Willan Company prepared a "Water Systems <br />Alternative Energy Feasibility Study" which the City approved in February 2019. This <br />study included an evaluation of the potential to install on -site renewable energy <br />systems to offset some of the City's electrical load, lower electric bills, and reduce the <br />associated greenhouse gas (GHG) emissions. The renewable energy resources that were <br />evaluated included installing solar PV modules on the roofs of the storage tanks at the <br />Garthe and West pump stations and included some preliminary designs. These designs <br />were simulated using HelioScope, an industry standard PV simulation program. This <br />program uses a local weather data file and calculates the hourly performance of the <br />system based on the angle of insolation, air temperature, wind speed, intensity of <br />clouds, etc. <br />City Council <br />26 — 33 <br />12/7/2021 <br />23 <br />PREVIEW Date: Nov 03, 2021 Workspace ID: WS00800354 Funding Opportunity Number: R22AS00023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.