My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AGENDA PACKET_2021-12-07
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
12/07/2021 Regular
>
AGENDA PACKET_2021-12-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2021 2:13:26 PM
Creation date
12/6/2021 5:43:05 PM
Metadata
Fields
Template:
City Clerk
Date
12/7/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1414
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
mg, <br />Generation of Solar Power at Garthe and West Pump Station Facilities Project <br />Bureau of Reclamation Water Energy and Efficiency Grant FY2022 <br />0 Describe any neWlp()IiCk�S oradministrative actions required to implement theproject. <br />No new policies or administrative actions are required to implement the Project. <br />0 f1lease also include an cml-imated project, schedule that' sh(AAIS the stages and duration of <br />the proposed Work, including major tasks, milcml-oncm,', and daft.m, . Milestones may <br />inchjde� but are not limited to, the fi)11()Wlingcomplete environmental and cultural <br />compliance; mobilization; begin (50% <br />complete); and c(�)n�r�t,r,ijct,i(�)r)lin�,�t-all(it-i(�)n (100% complete) <br />7-able .1, Pro.ject,Schedule <br />No. <br />Task/Milestone Start Date Completion Date <br />1 <br />Issue RFP to prepare design <br />documents <br />January 2022 <br />March 2022 <br />2 <br />Award contract for preparation of <br />design documents <br />April 2022 <br />April 2022 <br />3 <br />Design Phase <br />May 2022 <br />November 2022 <br />4 <br />for construction bids <br />November 2022 <br />December 2022 <br />5 <br />Award Construction Contract <br />Jan 2023 <br />Jan 2023 <br />6 <br />Construction Period (9 mos.) <br />March 2023 <br />November 2023 <br />7 <br />Complete Project <br />December 2023 <br />A-1101140, MTHMOGI UnrelffEWel I F-1 <br />• f1lease describe html the project promotes and encourages collaboration. Consider the <br />fi)11()Wling <br />• Is there Widespread support for the pnZiect'," f1lease provide specific details regarding <br />any support andlor partners involved in the project. What is the extent, of their, <br />involvement in the pnxess',` <br />As described D.5.1.1 above, the proposed Project is consistent with numerous planning <br />documents that the City was involved with and/or a part of. Many of these planning <br />documents, such as the City's 2020 Urban Water Management Plan (UWMP) were <br />prepared with widespread support and integration from the public, as well as numerous <br />local and regional agencies identified in Section 2.2.1 of this document. <br />The City of Santa Ana has started communication with Southern California Edison (SCE) <br />who are very supportive of this project and have been collaborating with the City on this <br />project. City of Santa Ana has been one of the leaders in conservation in the region and <br />City Council <br />26-34 <br />12/7/2021 <br />24 <br />PREVIEW Date: Nov 03, 2021 Workspace ID: WS00800354 Funding Opportunity Number: R22AS00023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.