|
City of Santa Ana
<br />Page 3 of 5
<br />Ritchey St Water Main Relocation, SA-7 Pressure Reducing Station Relocation & SR-55 Water Crossing Relocation (19-6438, 19-6439 & 19-6440), bidding on
<br />10/19/2021 2:00 PM (PST)
<br />" - '- ' 11/08/2021
<br />EXHIBIT 2
<br />Item #
<br />Item Code Type
<br />Item Description
<br />UOM
<br />QTY
<br />Unit Price
<br />Line Total
<br />Response
<br />Comment
<br />Ritchey
<br />St Water Main Relocation
<br />$1,476,100.00
<br />1
<br />1
<br />Mobilization/Demobilization*
<br />LS
<br />1
<br />$100,000.00
<br />$100,000.00
<br />Yes
<br />2
<br />2
<br />Sheeting, Shoring, Bracing and Excavation/Trench Protection
<br />LS
<br />1
<br />$5,000.00
<br />$5,000.00
<br />Yes
<br />3
<br />3
<br />8-Inch C900 PVC Pipe, DR-14
<br />LF
<br />260
<br />$270.00
<br />$70,200.00
<br />Yes
<br />4
<br />4
<br />16-Inch C905 PVC Pipe, DR-18
<br />LF
<br />1444
<br />$300.00
<br />$433,200.00
<br />Yes
<br />5
<br />5
<br />16-Inch Class 250 DIP
<br />LF
<br />120
<br />$1,100.00
<br />$132,000.00
<br />Yes
<br />6
<br />6
<br />8-Inch Gate Valve
<br />EA
<br />2
<br />$4,000.00
<br />$8,000.00
<br />Yes
<br />7
<br />7
<br />16-Inch Butterfly Valve, Class 150
<br />EA
<br />5
<br />$14,000.00
<br />$70,000.00
<br />Yes
<br />8
<br />8
<br />16-Inch Line Stop
<br />EA
<br />1
<br />$40,000.00
<br />$40,000.00
<br />Yes
<br />9
<br />9
<br />Fire Hydrant Assembly
<br />EA
<br />5
<br />$18,000.00
<br />$90,000.00
<br />Yes
<br />10
<br />10
<br />PIV & FDC Fire Connections
<br />EA
<br />4
<br />$14,000.00
<br />$56,000.00
<br />Yes
<br />11
<br />11
<br />2-Inch Water Service with Existing Meter and New Meter Box
<br />EA
<br />4
<br />$7,000.00
<br />$28,000.00
<br />Yes
<br />12
<br />12
<br />1-Inch Water Service with Existing Meter and New Meter Box
<br />EA
<br />5
<br />$4,000.00
<br />$20,000.00
<br />Yes
<br />13
<br />13
<br />2-Inch Combination Air Valve
<br />EA
<br />1
<br />$15,000.00
<br />$15,000.00
<br />Yes
<br />14
<br />14
<br />Construct Concrete Encasement
<br />LF
<br />84
<br />$300.00
<br />$25,200.00
<br />Yes
<br />15
<br />15
<br />Connections to Existing 8"/16" Mains
<br />EA
<br />3
<br />$20,000.00
<br />$60,000.00
<br />Yes
<br />16
<br />16
<br />Abandonment of Flange Outlets on Existing 24-inch Water Main
<br />EA
<br />2
<br />$1,500.00
<br />$3,000.00
<br />Yes
<br />17
<br />17
<br />Abandonment of 172" Services on Existing 24-inch Water Main
<br />EA
<br />3
<br />$4,000.00
<br />$12,000.00
<br />Yes
<br />16
<br />18
<br />Abandonment of Existing 1'72" Services
<br />EA
<br />9
<br />$2,500.00
<br />$22,500.00
<br />Yes
<br />19
<br />19
<br />Abandonment of Existing Fire Hydrant
<br />EA
<br />4
<br />$7,500.00
<br />$30,000.00
<br />Yes
<br />20
<br />20
<br />Abandonment of Existing 24-inch Water Main (Fit I with Slurry)
<br />LS
<br />1
<br />$7,500.00
<br />$7,500.00
<br />Yes
<br />21
<br />21
<br />Abandonment of Existing 16-inch Water Main (Including Fit I with Slurry and No Slurry)
<br />LS
<br />1
<br />$8,500.00
<br />$8,500.00
<br />Yes
<br />22
<br />22
<br />Potholing
<br />LS
<br />1
<br />$15,000.00
<br />$15,000.00
<br />Yes
<br />23
<br />23
<br />Signing and Striping
<br />LS
<br />1
<br />$10,000.00
<br />$10,000.00
<br />Yes
<br />24
<br />24
<br />Prepare and Obtain Approval of Traffic Control Plans
<br />LS
<br />1
<br />$1,000.00
<br />$1,000.00
<br />Yes
<br />25
<br />25
<br />Provide and Maintain Traffic Control
<br />LS
<br />1
<br />$65,000.00
<br />$65,000.00
<br />Yes
<br />26
<br />26
<br />Construction Staking
<br />LS
<br />1
<br />$29,000.00
<br />$29,000.00
<br />Yes
<br />27
<br />27
<br />Remove and Replace Curb, Gutter, and Sidewalk
<br />LS
<br />1
<br />$55,000.00
<br />$55,000.00
<br />Yes
<br />28
<br />28
<br />Over -Excavation and Import Backf ll Material—
<br />CY
<br />100
<br />$450.00
<br />$45,000.00
<br />Yes
<br />29
<br />29
<br />Permits (Allowance)
<br />LS
<br />1
<br />$10,000.00
<br />$10,000.00
<br />Yes
<br />30
<br />30
<br />As-Builts
<br />LS
<br />1
<br />$10,000.00
<br />$10,000.00
<br />Yes
<br />SA-7 Pressure
<br />Reducing Relocation
<br />$2,201,600.00
<br />31
<br />1
<br />Mobilization/Demobilization*
<br />LS
<br />1
<br />$200,000.00
<br />$200,000.00
<br />Yes
<br />32
<br />2
<br />Sheeting, Shoring, Bracing and Excavation/Trench Protection
<br />LS
<br />1
<br />$5,000.00
<br />$5,000.00
<br />Yes
<br />33
<br />3
<br />Construct New SA7 Valves, Piping, Fittings, and Appurtenances
<br />LS
<br />1
<br />$725,000.00
<br />$725,000.00
<br />Yes
<br />34
<br />4
<br />Construct 24-inch Piping, Valves and Fittings to Connection to Existing 24- inch Water Main
<br />LS
<br />1
<br />$250,000.00
<br />$250,000.00
<br />Yes
<br />35
<br />5
<br />Construct Concrete Anchor Block
<br />LS
<br />1
<br />$20,000.00
<br />$20,000.00
<br />Yes
<br />36
<br />6
<br />Construct New Energy Dissipater Facility
<br />LS
<br />1
<br />$40,000.00
<br />$40,000.00
<br />Yes
<br />37
<br />7
<br />Construct Phase 1 Site Improvements
<br />LS
<br />1
<br />$450,000.00
<br />$450,000.00
<br />Yes
<br />38
<br />8
<br />Construct Phase 2 Site Improvements
<br />LS
<br />1
<br />$75,000.00
<br />$75,000.00
<br />Yes
<br />39
<br />9
<br />Demolition of Existing SA 7 Facility
<br />LS
<br />1
<br />$80,000.00
<br />$80,000.00
<br />Yes
<br />40
<br />10
<br />Furnish and Install Electrical Equipment and Facilities
<br />LS
<br />1
<br />$200,000.00
<br />$200,000.00
<br />Yes
<br />41
<br />11
<br />Furnish and Install Instrumentation and Control Equipment and Facilities including Programing
<br />LS
<br />1
<br />$125,000.00
<br />$125,000.00
<br />Yes
<br />42
<br />12
<br />Construct Landscape and Irrigation Improvements
<br />LS
<br />1
<br />$65,000.00
<br />$65,000.00
<br />Yes
<br />43
<br />13
<br />Construction Staking
<br />LS
<br />1
<br />$18,000.00
<br />$18,000.00
<br />Yes
<br />44
<br />14
<br />Start-up, Testing and Training
<br />LS
<br />1
<br />$5,600.00
<br />$5,600.00
<br />Yes
<br />45
<br />15
<br />O&M Manuals and Warranties
<br />LS
<br />1
<br />$3,000.00
<br />$3,000.00
<br />Yes
<br />46
<br />16
<br />Permits (Allowance)
<br />LS
<br />1
<br />$10,000.00
<br />$10,000.00
<br />Yes
<br />47
<br />17
<br />As-Builts
<br />LS
<br />1
<br />$10,000.00
<br />$10,000.00
<br />Yes
<br />SR-55 Water Crossing Relocation
<br />$2,164,325.00
<br />City Council
<br />PlanetBids, Inc.
<br />I
<br />12/21 /2021
<br />
|