Laserfiche WebLink
City of Santa Ana <br />Page 4 of 5 <br />Ritchey St <br />Water Main <br />Relocation, SA-7 Pressure Reducing Station Relocation & SR-55 Water Crossing Relocation (19-6438, 19-6439 & 19-6440), bidding on <br />10/19/2021 2:00 PM (PST) <br />" - '- ' 11/08/2021 <br />EXHIBIT 2 <br />Item <br />Item <br />Type <br />Item Description <br />UOM <br />CITY <br />Unit Price <br />Line Total <br />Response Comment <br /># <br />Code <br />48 <br />1 <br />Mobilization/Demobilization* <br />LS <br />1 <br />$100,000.00 <br />$100,000.00 <br />Yes <br />49 <br />2 <br />Sheeting, Shoring, Bracing and Excavation/Trench Protection <br />LS <br />1 <br />$10,000.00 <br />$10,000.00 <br />Yes <br />50 <br />3 <br />12-Inch C900 PVC Pipe, DR-14 <br />LF <br />102 <br />$350.00 <br />$35,700.00 <br />Yes <br />51 <br />4 <br />12-Inch Class 350 DIP <br />LF <br />77 <br />$300.00 <br />$23,100.00 <br />Yes <br />52 <br />5 <br />24-Inch CML&C Steel Pipe <br />LF <br />137 <br />$1,725.00 <br />$236,325.00 <br />Yes <br />53 <br />6 <br />Bore and Jack 12-Inch Carrier Pipe within 30-inch Steel Casing <br />LF <br />249 <br />$2,200.00 <br />$547,800.00 <br />Yes <br />54 <br />7 <br />Bore and Jack 24-Inch Carrier Pipe within 42-inch Steel Casing <br />LF <br />249 <br />$2,700.00 <br />$672,300.00 <br />Yes <br />55 <br />a <br />12-Inch Gate Valve <br />EA <br />2 <br />$6,000.00 <br />$12,000.00 <br />Yes <br />56 <br />9 <br />24-Inch Butterfly Valve, Class 350 <br />EA <br />1 <br />$35,000.00 <br />$35,000.00 <br />Yes <br />57 <br />10 <br />3-inch Fiber Optic Conduits and Pull Boxes <br />LS <br />1 <br />$5,000.00 <br />$5,000.00 <br />Yes <br />58 <br />11 <br />Construct Concrete Encasement <br />LF <br />57 <br />$300.00 <br />$17,100.00 <br />Yes <br />59 <br />12 <br />Construct Concrete Anchor Block <br />EA <br />2 <br />$20,000.00 <br />$40,000.00 <br />Yes <br />60 <br />13 <br />Connections to Existing 12%24" Mains <br />EA <br />2 <br />$25,000.00 <br />$50,000.00 <br />Yes <br />61 <br />14 <br />Remove and Replace 21-inch Storm Drain Piping including Temporary Piping Facilities <br />LS <br />1 <br />$50,000.00 <br />$50,000.00 <br />Yes <br />62 <br />15 <br />Abandonment of Existing 24-inch Water Main and 30-inch Casing Crossing SR 55 (Fill with Slurry) <br />LS <br />1 <br />$15,000.00 <br />$15,000.00 <br />Yes <br />63 <br />16 <br />Abandonment of Existing 12-inch Water Main and 20-inch Casing Crossing SR 55 (Fill with Slurry) <br />LS <br />1 <br />$10,000.00 <br />$10,000.00 <br />Yes <br />64 <br />17 <br />Abandonment of Existing 12-inch and 24-inch Water Mains on the East Side of Freeway (Fill with Slurry) <br />LS <br />1 <br />$20,000.00 <br />$20,000.00 <br />Yes <br />65 <br />18 <br />Site Demolition (East Side of Freeway) <br />LS <br />1 <br />$5,000.00 <br />$5,000.00 <br />Yes <br />66 <br />19 <br />Site Restoration (East Side of Freeway) <br />LS <br />1 <br />$80,000.00 <br />$80,000.00 <br />Yes <br />67 <br />20 <br />Construction Staking <br />LS <br />1 <br />$20,000.00 <br />$20,000.00 <br />Yes <br />68 <br />21 <br />Survey Monitoring per Caltrans Permit Requirements <br />LS <br />1 <br />$65,000.00 <br />$65,000.00 <br />Yes <br />69 <br />22 <br />Over -Excavation and Import Backfill Material— <br />CY <br />100 <br />$450.00 <br />$45,000.00 <br />Yes <br />70 <br />23 <br />Bore/Receiving Pit Dewatering (Allowance) <br />LS <br />1 <br />$50,000.00 <br />$50,000.00 <br />Yes <br />71 <br />24 <br />Permits (Allowance) <br />LS <br />1 <br />$10,000.00 <br />$10,000.00 <br />Yes <br />72 <br />25 <br />As-Builts <br />LS <br />1 <br />$10,000.00 <br />$10,000.00 <br />Yes <br />Asterisk <br />Notes (per P-1 <br />$0.00 <br />73 <br />= Mobilization/Demobilization Bid Item is limited to a maximum of 5% of the Total Base Bid for the Bid Schedule. <br />EA <br />0 <br />$0.00 <br />$0.00 <br />Yes <br />** = The quantity for this bid item is shown for bid comparison only. This bid item shall not be subject to the "25%" limit as stated in Section <br />74 <br />3-2 of the Standard Specifications. The actual amount for this item will be dictated by the actual quantity used, and the Agency reserves the <br />EA <br />0 <br />$0.00 <br />$0.00 <br />Yes <br />right to increase or decrease the quantity of this item accordingly. <br />City Council 24 — 9 12/21/2021 <br />PlanetBids, Inc. <br />