My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DAVID VOLZ DESIGN LANDSCAPE ARCHITECTURE, INC.
Clerk
>
Contracts / Agreements
>
D
>
DAVID VOLZ DESIGN LANDSCAPE ARCHITECTURE, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2022 9:57:44 AM
Creation date
1/3/2022 9:54:08 AM
Metadata
Fields
Template:
Contracts
Company Name
DAVID VOLZ DESIGN LANDSCAPE ARCHITECTURE, INC.
Contract #
A-2021-246
Agency
Public Works
Council Approval Date
12/7/2021
Expiration Date
12/6/2024
Insurance Exp Date
3/14/2022
Destruction Year
2029
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Park Roadway improvements at Castor Street, including gate, bollards and entrance <br />signage <br />• Walkways <br />• Pet Proof Fence and Gate which include dog park entry corals <br />• Agility Course Features <br />• Small Auditorium in Large Dog space meant to view dog shows <br />• Dog Training Area <br />• Optimal Surface Material for dog parks and children's playgrounds <br />• Children's Play Area with Playground Equipment <br />• Restrooms <br />• California Native landscaping, including trees <br />• Site Lighting <br />• Site Amenities, including waste bag dispensers, trash cans, drinking fountains with pet <br />bowls, interpretive signage, information board, benches, shade features, picnic tables, <br />bike racks <br />• Drainage which utilizes "Low Impact Development" concepts with goal for full site <br />infiltration. <br />• Storm Water Mitigation <br />The improved area is to be utilized Citywide by dog owners, and families with children and by <br />various programs conducted by the Santa Ana Parks, Recreation and Community Service staff. <br />Consultant Responsibilities: <br />The Consultant's responsibilities include the following, and shall consist of the following project <br />tasks: <br />Consultant is responsible for providing all concept design as required for all components within the <br />project scope of work. <br />Consultant will also be responsible for facilitating up to six (6) meetings with City Staff and up to <br />four (4) public outreach meetings to obtain input and finalize concept plan. Consultant should provide <br />knowledge and share feedback on ideal dog park designs. <br />Consultant shall provide review sets in .pdf format. <br />Phase]: Overall Layout Concept <br />Preliminary overall layout concept phase shall include Kick-off meeting with City Staff to discuss <br />scope of work, project goals and objectives, potential elements and issues and schedule. Pre -Final <br />Concept plan will also include up to three (3) meetings with City Staff (facilitated by consultant) to <br />obtain input and finalize layout concept plan in order to proceed to Phase 2. Consultant shall assist in <br />attaining community feedback, which may include up to two (2) community meetings. <br />➢ Overall layout concept shall include logistical elements such as considering different public <br />entry points, potential parking, and general park organization. <br />City of Santa Ana RFP 21-119 <br />Page Al-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.