Laserfiche WebLink
15.To compensate the contractor for the procurement of the carport structure, engineering <br /> services, pouring the concrete footings, erecting the structure, and painting the underside of <br /> the roof structure and columns per PCO #41 dated June 20t", 2024. <br /> TOTAL AGREED PRICE = $18,516.04 <br /> 16.To compensate the contractor for the demolition, rebuild, and addition of waterproofing to <br /> the basin and face of the waterfall which will be retextured and repainted per PCO #42 <br /> dated July 17t", 2024. <br /> TOTAL AGREED PRICE= $39,941,12 <br /> 17.To compensate the contractor for filling the void underneath the overhand at the rear of the <br /> Underwater View Structure per PCO #43 dated July 17t", 2024. <br /> TOTAL AGREED PRICE= $17,102.25 <br /> 18.To compensate the contractor for the controls of the HVAC system in the Holding Building <br /> per PCO #44 dated July 17t", 2024. <br /> TOTAL AGREED PRICE = $14,484.41 <br /> 19.To compensate the contractor for the demolition and repair of the upper wall that interferes <br /> with the chute between P1 & P2 in the otter pond per PCO #45 dated June 26t", 2024. <br /> TOTAL AGREED PRICE_ $29,717.54 <br /> 20.To compensate the contractor for the repair of the Underwater View Structure openings for <br /> proper glass installation to occur including the time and material to shim and caulk the <br /> openings per PCO #46 dated June 261", 2024. <br /> TOTAL AGREED PRICE=$5,863.49 <br /> 21.To compensate the contractor to modify Rooms 202 & 203 in the Holding Building for future <br /> animal containment, including placement of drywall, concrete, plumbing, and electrical work <br /> per PCO #47 dated June 26t", 2024. <br /> TOTAL AGREED PRICE= $8,404.62 <br /> 22.To compensate the contractor for the relocation of the irrigation system connection to the <br /> water line in the primate exhibit per PCO #48 dated June 26t", 2024. <br /> TOTAL AGREED PRICE = $3,303.86 <br /> Page 3 of 5 <br />