My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GREAT AMERICAN INSURANCE GROUP (HYM ENGINEERING) (SANTA ANA ZOO GIANT RIVER OTTER & PRIMATE TRAILS)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
GREAT AMERICAN INSURANCE GROUP (HYM ENGINEERING) (SANTA ANA ZOO GIANT RIVER OTTER & PRIMATE TRAILS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2024 9:36:01 AM
Creation date
1/20/2022 9:23:50 AM
Metadata
Fields
Template:
Contracts
Company Name
GREAT AMERICAN INSURANCE GROUP (HYM ENGINEERING)
Contract #
P 16-2658
Agency
Public Works
Council Approval Date
11/2/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15.To compensate the contractor for the procurement of the carport structure, engineering <br /> services, pouring the concrete footings, erecting the structure, and painting the underside of <br /> the roof structure and columns per PCO #41 dated June 20t", 2024. <br /> TOTAL AGREED PRICE = $18,516.04 <br /> 16.To compensate the contractor for the demolition, rebuild, and addition of waterproofing to <br /> the basin and face of the waterfall which will be retextured and repainted per PCO #42 <br /> dated July 17t", 2024. <br /> TOTAL AGREED PRICE= $39,941,12 <br /> 17.To compensate the contractor for filling the void underneath the overhand at the rear of the <br /> Underwater View Structure per PCO #43 dated July 17t", 2024. <br /> TOTAL AGREED PRICE= $17,102.25 <br /> 18.To compensate the contractor for the controls of the HVAC system in the Holding Building <br /> per PCO #44 dated July 17t", 2024. <br /> TOTAL AGREED PRICE = $14,484.41 <br /> 19.To compensate the contractor for the demolition and repair of the upper wall that interferes <br /> with the chute between P1 & P2 in the otter pond per PCO #45 dated June 26t", 2024. <br /> TOTAL AGREED PRICE_ $29,717.54 <br /> 20.To compensate the contractor for the repair of the Underwater View Structure openings for <br /> proper glass installation to occur including the time and material to shim and caulk the <br /> openings per PCO #46 dated June 261", 2024. <br /> TOTAL AGREED PRICE=$5,863.49 <br /> 21.To compensate the contractor to modify Rooms 202 & 203 in the Holding Building for future <br /> animal containment, including placement of drywall, concrete, plumbing, and electrical work <br /> per PCO #47 dated June 26t", 2024. <br /> TOTAL AGREED PRICE= $8,404.62 <br /> 22.To compensate the contractor for the relocation of the irrigation system connection to the <br /> water line in the primate exhibit per PCO #48 dated June 26t", 2024. <br /> TOTAL AGREED PRICE = $3,303.86 <br /> Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.