Laserfiche WebLink
23.To compensate the contractor for the removal and replacement of the 1-1/2" backflow in the <br /> service yard per PCO #49 dated July 10t", 2024. <br /> TOTAL AGREED PRICE= $4,574.56 <br /> 24.City requested to evaluate substituting the asphalt pavement per plan to a concrete path to <br /> match the rest of the Zoo walkways. In discussions with the contractor and value <br /> engineering credit, this work was to be at no additional cost per PCO #50 dated August 6th, <br /> 2024. <br /> TOTAL AGREED PRICE= $0 <br /> 25.To compensate the contractor for the removal and replacement of the existing hotwire <br /> system within the otter exhibit per PCO #51 dated August 6t", 2024. <br /> TOTAL AGREED PRICE_ $8,029.19 <br /> 26.To compensate the contractor for additional engineering required to meet the sketch for the <br /> cantilevered edge, and the obtainment of additional material and labor per PCO #52 dated <br /> June 26t", 2024. <br /> TOTAL AGREED PRICE= $14,870.38 <br /> 27.To compensate the contractor for the painting of the Underwater View Shelter Roof and the <br /> installation of the downspout per PCO #53 dated August 2nd, 2024. <br /> TOTAL AGREED PRICE = $3,255.23 <br /> TOTAL CHANGE ORDER PRICE =$431,671.79 <br /> Page 4 of 5 <br />