My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KDC SYSTEMS (2)
Clerk
>
Contracts / Agreements
>
K
>
KDC SYSTEMS (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2024 4:42:57 PM
Creation date
2/14/2022 2:31:21 PM
Metadata
Fields
Template:
Contracts
Company Name
KDC SYSTEMS
Contract #
A-2022-009-01
Agency
Public Works
Council Approval Date
1/18/2022
Expiration Date
1/17/2025
Insurance Exp Date
10/1/2025
Destruction Year
2030
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
equipment has been completed, the Contractor shall perform the following post -installation <br />field verification tests: <br />1. Site Acceptance Test (SAT) <br />Once system installation has been successfully completed and installed, the <br />Contractor shall perform a site acceptance test (SAT). The Contractor shall test the <br />full operation and functionality of the completed system in the SAT with a City <br />Representative. The Contractor shall provide any rectifications required to complete <br />the SAT. The Contractor shall utilize the form in Exhibit C to complete the SAT <br />and shall advise any additional components that necessitate testing. Once all <br />operation and functionality are confirmed and approved by City Personnel in the <br />SAT, the Contractor shall commence on -site closeout and final completion of the <br />project. <br />2. On -Site Closeout <br />During the on -site closeout, the Contractor shall review the panel construction <br />drawings for any redlines, changes or corrections that have been added and confirm <br />they match in the field. The Contractor shall confirm all non -conformances have <br />been corrected, re -tested, and signed off. The Contractor shall confirm the UL508 <br />label has been affixed to the panel. The Contractor shall clean and vacuum the <br />panel as well as take detailed photos after installation. <br />3. In -Office Closeout <br />The Contractor shall redline all changes to the design made during construction and <br />testing on the as -built panel schematics and shall provide all records including <br />photos and schematics to the City upon closeout of the project. <br />4. PANEL DESIGN SERVICES <br />Upon request by the City, the Contractor shall provide control panel design services that <br />conform to City standards. Control panel designs and drawings shall contain fully <br />engineered diagrams that specify all equipment, back panels, terminal blocks, and special <br />components and related items. The wiring diagrams, specific 1/0, panel dimensions, items <br />and quantity list with specific part numbers shall also be included in the designs. All wiring <br />diagrams shall show all components, including power and control wiring, instrumentation <br />wiring, ground wiring, terminal blocks, and their associate nameplates with terminal block <br />termination designations, identification labels, and wire sizes, types and colors. Panel <br />design documents shall be complete and inclusive of all information necessary for the City <br />to utilize for construction purposes. When applicable all panel designs and schematics shall <br />include, but are not limited to: <br />1. Table of Contents <br />2. Drawing Symbol Key <br />3. Bill of Materials <br />4. Construction Comments and Special Instruction <br />5. Control Panel Exterior Detail <br />City of Santa Ana RFP 21-100 <br />Water Resources Panel Building Services <br />Page 19 of 39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.