My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KDC SYSTEMS (2)
Clerk
>
Contracts / Agreements
>
K
>
KDC SYSTEMS (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2024 4:42:57 PM
Creation date
2/14/2022 2:31:21 PM
Metadata
Fields
Template:
Contracts
Company Name
KDC SYSTEMS
Contract #
A-2022-009-01
Agency
Public Works
Council Approval Date
1/18/2022
Expiration Date
1/17/2025
Insurance Exp Date
10/1/2025
Destruction Year
2030
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. Terminal Strip Detail <br />7. Control Panel Labels <br />8. AC Power Distribution <br />9. DC Power Supply <br />10.Time Relays <br />11. Panel Temperature Monitor <br />12. Switch Details <br />13.AC Discrete Output Relays <br />14.Discrete Input Module <br />15.Analog Input Module <br />16.Analog Output Module <br />17. Network Components <br />18.Interior Panel Dimensions <br />19. Exterior Panel Dimensions <br />The Contractor shall also provide calculations regarding the temperature, load power, and <br />uninterruptable power source (UPS) runtime when applicable as described below: <br />1. Enclosure temperature calculations shall be based on operating duty cycle for <br />equipment in the enclosure. Size enclosures to use passive or active cooling <br />techniques as required to maintain the recommended operating temperature for any <br />component inside the enclosure given project environmental conditions as specified <br />by the City. <br />2. Full load power calculations for all sources of power shall be provided. <br />3. UPS runtime calculations for the calculated full load supplied by the UPS and the <br />selected batteries shall be provided to the City. <br />All panel designs and calculations shall be completed in compliance with all functional <br />specifications and applicable standards, codes and regulations. <br />5. ADDITIONAL PANEL EQUIPMENT <br />The Contractor shall procure and provide miscellaneous equipment required to complete <br />tasks related to industrial control panels for water pump stations, pressure control stations, <br />sewer lift stations, water well sites, and any additional sites upon request by the City. <br />Miscellaneous equipment may include but is not limited to replacement parts, retrofits, <br />upgrades, any additional supplementary parts required for repair, etc. <br />6. TRAINING SERVICES <br />Upon request by the City, the Contractor shall provide in -person training services in <br />accordance with National Electrical Code (NEC) and Underwriters Laboratories Inc (UL) <br />regulations. The Contractor shall provide customizable training classes regarding specific - <br />use industrial control panels, panel components, wiring, switching devices, etc. The <br />Contractor shall also review the operation and maintenance for each component of the <br />control panels. All manufacturer's manuals for equipment shall be included as well as <br />operations and maintenance manuals for key components. <br />City of Santa Ana - RFP 21-100 <br />Water Resources Panel Building Services <br />Page 20 of 39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.