Laserfiche WebLink
D. CODE COMPLIANCE <br />All control panels shall be manufactured in accordance with: <br />• Underwriters Laboratories Inc (UL508 & UL508A) <br />• Institute of Electrical and Electronics Engineers (IEEE) <br />• National Electrical Manufacturers Association (NEMA ICS 6 & 250) <br />• International Electrotechnical Commission (IEC) <br />• National Electrical Code (NEC) standards <br />• National Fire Protection Agency (NFPA 70) <br />• American National Standards Institute (ANSI) <br />E. PROJECT MANAGEMENT AND COORDINATION <br />When a request for service is issued to the City, the Contractor shall issue an estimate to the <br />City's designated Project Manager, The Contractor shall not proceed with any work without <br />the approval of the City's designated project manager. <br />Contractors shall invoice the City on a monthly basis for all work performed during the period <br />or provide a one-time invoice at the completion of work issued. Each invoice shall be <br />accompanied by a summary of tasks performed, contract agreement number, results and <br />progress on long-term tasks if any. <br />F. SUBCONTRACTORS <br />The use of Subcontractors is allowed, but will require approval by City prior to start of any <br />assigned work. Upon commencement of work, the Contractor shall be responsible for services <br />provided by any subcontractor as if Contractor were providing the services with its own <br />organization. When a Subcontractor performs all or any part of the work, a markup shall be <br />applied to the Subcontractor's actual cost of such work. The Contractor may add a markup of <br />10 percent on the first $5,000 of the subcontracted portion of the extra work and a markup of 5 <br />percent on work added in excess of $5,000 of the subcontracted portion of the work may be <br />added by the Contractor. <br />G. MARKUP <br />The following markup percentages shall be added to the Contractor's costs and shall constitute <br />the markup for all overhead and profits (to the sum of the costs and markups, one (1) percent <br />shall be added as compensation for bonding): <br />1) Labor................................................................................................20 <br />2) Materials...........................................................................................15 <br />3) Equipment Rental............................................................................. 15 <br />4) Other Items and Expenditures, ......................................................... 15 <br />H. MINIMUM QUALIFICATIONS <br />City of Santa Ana - RFP 21-100 <br />Water Resources Panel Building Services <br />Page 21 of 39 <br />