Laserfiche WebLink
E. Relevant Project Experience <br />Arvin Community Services District 2021 <br />Project: Arsenic Mitigation Phase II <br />(4) PLC Control Panels, Instrumentation, SCADA, PLC & HMI Programming for the integration of 7 <br />Remote Well and Booster Station sites. <br />Contract Amount: $ 328,633 Contact P&J Electric 661-822-6217 <br />Metropolitan Water District <br />Project: F. E. Weymouth Water Treatment Plant Chemical Upgrades 2019 <br />(27) RTU Termination and Communication Cabinets, Chemical Tank Fill, Pump Control, Alarm, Valve <br />Control and Safety Shower Control Panels and Instrumentation. <br />Contract Amount: $364,976.00, Contact: Hobbs Bannerman 310-212-6500 <br />Los Angeles <br />Department of <br />IDWPI water & Power <br />Los Angeles Department of Power and Water <br />Project: Elysian Reservoir Quality Improvement 2018 <br />(17) Pump Control, PLC, Telecom, Hydraulic, Air Compressor and Sample Pump Control Panels and <br />Instrumentation. <br />Contract Amount: $470,928.00, Contract: CSI Electric 562-946-0700 <br />The City of Paso Robles <br />Project: Wastewater Treatment Plant Upgrade 2017 <br />(15) PLC, Chemical, Pump Control and Truck Unloading Control Panel, Instrumentation, SCADA, PLC & <br />HMI Programming <br />Contract Amount: $1,092,641.00, Contract: Southern Contracting 760-744-0760 <br />Project: Wastewater Tertiary Treatment Facilities 2019 <br />(1) Control Logix PLC, Integration of UV Trojan PLC, Instrumentation, SCADA, PLC & HMI Programming <br />Contract Amount: $232,889.00, Contract: Electricraft 805-544-8224 <br />County of Ventura Public Works — Active Client <br />Various Pump Station Control Panels: Greentree Booster Pump Station, Bradley Turnout Station, District <br />1 S&K Pump Station. <br />Contact: Raul Ruiz 805-378-3043 <br />F. References See Attachment 3 <br />G. Fee See Cost Proposal in Separate Cover <br />5 of 11 <br />