Laserfiche WebLink
1.F Foundation Reports <br />1. One boring at each view deck location to <br />depth of 20 feet or more below creek bed <br />2. Field and laboratory testing of samples <br />3. Analysis of test results and research <br />4. Preparation of foundation reports <br />5. Respond to comments from City and final <br />reports <br />1.1-1 Creek Bank Planting <br />1. Review existing conditions and proposed <br />disturbed areas <br />2. Add single sheet to original plan package <br />(details and notes already in original scope) <br />TASK 2 - 50% DESIGN DEVELOPMENT <br />2.A Civil Engineering <br />Add single sheet to original plan package for pseudo - <br />pedestrian bridge based on City provided detail and other <br />site components and adjustments <br />2.13 Structural Engineering <br />The necessary design calculations and drawings will be <br />prepared for the two view decks and supporting retaining <br />walls including required details for construction. <br />2.0 Landscaping <br />Add single sheet to original plan package <br />2.E Cost Estimate <br />No Change - added cost estimating covered above <br />2.F Specifications <br />No Change - added specifications covered above <br />TASK 3 - 90% and 100% CONSTRUCTION DOCS <br />The H&A Team will first address all City staff review <br />comments made on the 50% submittal and make the <br />RFP No. 20-154 <br />Santiago Park Main Street Entrance Design <br />using RFP site plan and <br />I.. &A T <br />lstGityTeview p, paFe <br />agenda halt meeting <br />prepare mini ites revise <br />e <br />GGRGePts <br />GITV and I..I& <br />Team <br />2nd Git„ review _pip prepare <br />aneRda helm meeting <br />ft�/ <br />ites, revise <br />nap <br />CITYd H&A <br />Team <br />`, <br />3r�'�Tevievw-prepare <br />I agenda holdmeeting,CITY <br />L <br />prepare mini ites nnpnept <br />e <br />and 1..1& <br />Team <br />4�6 <br />Develop design plar]-QM' <br />rH&ATeam <br />Engineering <br />B Develop design plM&A <br />Team <br />Structural <br />C Develop design plans - <br />H&A Team <br />Landscape <br />-D <br />E'er <br />H uT,a ° ; ea,� <br />2 <br />Develop nest estimate <br />H&A Tearn <br />Identify rent aired tenhpinal <br />spenifinatinns <br />H&A Tearn <br />6 n�-Review <br />H &A T <br />H CITY REVIEW (50% <br />CITY <br />submittal) <br />GITV and 4JR-A <br />Team <br />necessary revisions. Next the documents will be developed ;Develop 90%design plan <br />into a complete set of bid documents for the 90% submittal. 3 All <br />_Civil Engineering H&A Tea <br />H&A intends there will be few, if any, City review comments <br />on the 90% submittal. The package will include all of the <br />City Council 17 - 12 3/15/2022 <br />HUNSAKER& ASSOCIATES IRVINE, INC. <br />