items listed in the RFP on page A1-3 and be ready for <br />building permit submittal with all required supporting <br />calculations and documentation. <br />3.E — 3N Cost Estimate <br />No Change — added cost estimating covered above <br />3.F — 3.0 Specifications <br />No Change — added specifications covered above <br />3.G1— 3.P Permitting <br />Due to the construction within the creek and related <br />floodplain, the project will require the following permits: <br />• Corps under Section 404 (discharge of fill into waters) <br />• Regional Water Quality Control Board under Section <br />401 <br />• Section 1601 Streambed Alteration agreement from <br />the California Fish and Wildlife agency <br />The final set of bid documents will incorporate all the City <br />review comments, conditions from the approved 401, 404 <br />and 1601 permits and building permit inputs and go through <br />a final QA/QC check before submittal for City approval and <br />obtaining the building permit for the grading and structures. <br />TASK 4 - RIDDING SUPPORT, CONSTRUCTION <br />ADMINISTRATION AND RECORD DRAWINGS <br />The H&A Team looks forward to supporting City staff in the <br />bidding and construction process since we agree the design <br />team can be very valuable during this critical stage in <br />protecting the City from problems. H&A has anticipated both <br />pre -bid and pre -construction meetings to be attended and <br />is ready to provide rapid responses to any issues that arise <br />from City staff. The H&A Team will also be proactive in <br />warning the City and contractor of potential problems based <br />on our intimate knowledge of the bid documents. <br />SCHEDULE <br />Our revised schedule on the next page is based on the <br />original plus the change order scope of services above. We <br />are assuming approval for the change order and final <br />concept drawing in mid -February (2 months from now) and <br />have adiusted the 50% and 90% review periods to 4 weeks <br />RFP No. 20-154 <br />Santiago Park Main Street Entrance Design <br />B Develop 90% design plans I H&A Team I <br />- Structural <br />C Develop 90% design plans H&A Team <br />-Landscape <br />Develop 0 design <br />u,� <br />C l e�rcccriGa l <br />E Update GOst estimate to <br />90% level H&A Te <br />Prepare draft teGhnlnal <br />i= Nrr&A Team <br />sperifiratiens <br />Los I LOT, - raM 0331, "TA no 1.,1 <br />G1 Submit draft permits — 401, I H&A Team <br />404 and 1601 for review <br />CITY REVIEW (90% <br />H submittal) including CITY <br />building permit process <br />90 City review prepare <br />I agenda held meeting CITY and I -IQ -A <br />prepare mini itec revise Team <br />Develop 100% design H&A Team <br />plans - Civil Engineering <br />K Develop 100% design H&A Team <br />plans - Structural <br />L Develop 100% design H&A Team <br />plans - Landscape <br />M Develop 100% design H&A Team <br />plans - Electrical <br />N : Prepare final cost estimate I H&A Team <br />0 Prepare final technical H&A Team <br />specifications <br />P Obtain approvals for 401, H&A Team <br />404 and 1601 permits <br />Q QC Review H&A Team <br />3 : CITY APPROVAL (Final <br />R PS&E) including building CITY <br />permit <br />City Council <br />HUNSAKER& SSOCIATES IRVINE, INC. <br />