Laserfiche WebLink
Attachment A - Joint Agreement for 800 MHz CCCS <br />Page 52 of 83 <br />The Lead Agency Director will be responsible for the oversight and compliance of this standard. <br />Due to the potential of interference Issues to expand beyond a specific region or into another <br />County, Lead Agency staff should also be notified If any interference is detected and is believed <br />to have originated from a CCCS radio equipped aircraft. <br />4.22 In -building Coverage <br />Purpose or Objective <br />Establishes policy on the approval, usage and regulation of in -building coverage enhancement <br />devices on System frequencies and the tracking of all locations utilizing these devices for the <br />purpose of mitigating Interference Issues. In -building coverage systems include Emergency <br />Responder Radio Communications Systems (ERRCS), Bi-Directional Amplifiers (BDA), and <br />Distributed Antenna Systems (DAS). <br />Technical Background <br />The System is designed for mobile and portable radio coverage but cannot provide 100% <br />coverage in all places. In -building coverage devices aim to improve radio access within a <br />confined space such as high -density buildings. Although the use of in -building coverage devices <br />may Improve in -building coverage, it may also create interference issues with the overall <br />System. Tracking the locations of all in -building coverage devices will aid in quickly locating <br />offending equipment. <br />Protocol/Standard <br />The Lead Agency must approve and regulate in -building coverage systems on frequencies <br />licensed to the County of Orange. It is important for the Lead Agency to maintain a list of <br />facilities that have in -building coverage devices used with the System. <br />Any agency or department planning to install an in -building coverage system will submit their <br />plans to the Lead Agency as described in the current OCSD ERRCS Guidelines document. This <br />will include the physical address, emergency contact information, building name, location within <br />the building, manufacturer and model number. The Lead Agency must review and approve <br />operation of the installed in -building coverage system to ensure proper installation and <br />operation and to mitigate any adverse effect on the System. <br />It is the responsibility of the equipment/facility owner to comply with all requirements of the <br />National Fire Protection Association (NFPA), California Fire Code (CFC) and Federal <br />Communications Commission (FCC) including licensing, location reporting, and interference <br />mitigation. <br />