My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
General Plan Binder
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
04/19/2022 Regular
>
General Plan Binder
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 8:48:02 AM
Creation date
4/20/2022 3:24:46 PM
Metadata
Fields
Template:
City Clerk
Date
4/19/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
350
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. 4th Street after the 1933 Earthquake <br />Buildings in Santa Ana experienced substantial structural damage <br />from the 1933 Long Beach Earthquake. Shown here are storefronts <br />along 4th Street, including the Spurgeon Building. <br />Photo courtesy of Orange County Archives, image taken in 1933 <br />. Community Input <br />People of all ages and backgrounds expressed confidence in the <br />City's ability to continue planning for and protecting residents <br />from the natural environmental hazards during all phases of the <br />General Plan preparation, including at events such as the 2016 <br />Ciclovia event (pictured above) and focused input such as the <br />2017 General Plan Advisory Group meeting. <br />CITY OF SANTA ANA GENERAL PLAN foij .I..•• <br />
The URL can be used to link to this page
Your browser does not support the video tag.