My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
General Plan Binder
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
04/19/2022 Regular
>
General Plan Binder
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 8:48:02 AM
Creation date
4/20/2022 3:24:46 PM
Metadata
Fields
Template:
City Clerk
Date
4/19/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
350
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-r - <br />N-. <br />Aw <br />t <br />_P <br />Mabury Park Stormwater Project. completed in 2019, the project included the construction of a 7,000-square- <br />'' foot bioretention basin designed to capture and infiltrate approximately 27,000 cubic feet of stormwater during a <br />significant storm. The bioretention basin will capture stormwater runoff and use natural filtering through the soil to <br />remove pollutants before it is released into the City's storm drain system. This project was the first regional stormwater <br />infiltration best management practice (aka BMP) in the City of Santa Ana. <br />
The URL can be used to link to this page
Your browser does not support the video tag.