Laserfiche WebLink
-r - <br />N-. <br />Aw <br />t <br />_P <br />Mabury Park Stormwater Project. completed in 2019, the project included the construction of a 7,000-square- <br />'' foot bioretention basin designed to capture and infiltrate approximately 27,000 cubic feet of stormwater during a <br />significant storm. The bioretention basin will capture stormwater runoff and use natural filtering through the soil to <br />remove pollutants before it is released into the City's storm drain system. This project was the first regional stormwater <br />infiltration best management practice (aka BMP) in the City of Santa Ana. <br />