My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2022-05-03
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
05/03/2022 Special and Regular & HA
>
Agenda Packet_2022-05-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 10:10:44 AM
Creation date
4/28/2022 9:49:52 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
5/3/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C - FIRM & TEAM EXPERIENCE <br /> AEI has completed FCA reports more than 50 Million SF of building space. Please refer to the following <br /> pages for a discussion of relevant FCA projects recently completed by AEI Consultants: <br /> City of Columbia, Missouri <br /> Client: City of Columbia Missouri — Department of Public Works <br /> Contact: David Nichols — Public Works Director; (573) 874-7255, david.nichols@como.go <br /> Dan Darnell — Purchasing Manager (573) 874-7255 dan.darnell@como.gov <br /> Project AEI prepared FCAs in accordance with ASTM E2018-15 on a portfolio of 23 <br /> Discussion: buildings owned and operated by the City of Columbia. The portfolio comprised <br /> an area of 423,896 SF and consist of fire stations, a police station, a police <br /> training center, armory, city hall and various office buildings and a clinic. AEI is <br /> also completed bar coding of all assets and is also performed a cursory Level I <br /> Energy Audit to determine if the installation of Energy Conservation Measures <br /> would have any measurable impact upon energy savings. Matt Wasson, Don <br /> Gerardi and Michael Novick performed field inspections. Kyle Christiansen acted <br /> as the Project Executive and Project Manager and performed senior level <br /> technical review. <br /> Presentation: AEI utilized an FCA software application with similar capabilities to Kykloud as <br /> well as tablet data collection devices in developing FCA reports. AEI's project <br /> deliverables include narrative FCA reports, geo-coded photos, equipment & <br /> condition inventories, ADA accessibility data and cost estimates for future <br /> maintenance and replacements. Key information included in the reports is each <br /> building's Facility Condition Index (FCI), Expected and Remaining Useful Lives <br /> (EULs & RULs) of equipment and building systems, and a 10 years capital <br /> expenditure budget. All that data is integrating seamlessly with the client's <br /> maintenance management software platform. <br /> Date: Com leted Ma 2018 <br /> A; M.r lug <br /> =! Ms +OR <br /> •�: i f <br /> Old <br /> _ <br /> City Council AE1 COnSUltants 5/3/2022 <br /> ;. . <br />
The URL can be used to link to this page
Your browser does not support the video tag.