My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2022-05-03
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
05/03/2022 Special and Regular & HA
>
Agenda Packet_2022-05-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 10:10:44 AM
Creation date
4/28/2022 9:49:52 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
5/3/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C - FIRM & TEAM EXPERIENCE <br /> Laguna Art Museum, Laguna Beach, CA <br /> Client: The Laguna Art Museum <br /> Contact: Joel Woodward — Director of Operations — 307 Cliff Drive, Laguna Beach, CA 92651 <br /> •woodard la unaartmuseum.or 949 494-8971 x206 <br /> Project AEI prepared Facility Condition Assessment/Property Condition Survey on an 18,000 SF <br /> Discussion: art museum and community center that was originally constructed in 1929 and <br /> expanded in 1986. The building was located on a zero-lot line basis and included 2 <br /> floors above grade plus a walk-out basement/terrace level. The assessment was <br /> completed in accordance with ASTM E2018-15. AEI's detailed investigation included the <br /> use of specialty system consultants which provided detailed analysis of the following <br /> building systems: 1) Building Envelope & Roof; 2) Mechanical, Electrical, Plumbing (MEP) <br /> / Fire & Life Safety & 3) Elevator Conveying Systems. AEI's detailed report included <br /> short term cost estimates related to deferred maintenance and accessibility upgrades. A <br /> long-term capital plan over a 15-year period for various system replacements and <br /> retrofits. <br /> Presentation: Narrative report with photographs detailing various building systems. Cost estimate <br /> tables were presented for immediate and life safety repairs, and a detailed capital <br /> reserve plan over a 15-year period. A Review of ADA requirements compliance and <br /> Seismic analysis was not included in the Scope of Work. <br /> Date: Project authorization was granted on 1/3/20 and was completed on 2/3/20 <br /> M <br /> PP I -� <br /> 1 ■ <br /> w <br /> y l <br /> MM10 <br /> City Council AE1 Consultants 5/3/2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.