My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2022-05-03
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
05/03/2022 Special and Regular & HA
>
Agenda Packet_2022-05-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 10:10:44 AM
Creation date
4/28/2022 9:49:52 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
5/3/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C - FIRM & TEAM EXPERIENCE <br /> Rocky Mountain Regional Medical Center — US Dept. of Veterans Affairs <br /> Client: DavEnergy Solutions & US Department of Veteran's Affairs <br /> Contact: Jason Ha e: jason.ha e davener .com — 912 667-7847 <br /> Portfolio AEI prepared a detailed Facility Condition Assessment on the VA Medical Center <br /> Discussion: campus in Aurora, Colorado. This new facility includes approximately 1.2 million <br /> square feet of space set on a 31-acre campus. The property is improved with 10 <br /> major campus/clinical buildings as well as a concourse connecting all <br /> improvements. A mechanical pant and two parking garages also exist on the <br /> campus and are included in the assessment. AEIs scope of work includes a <br /> complete inventory of all building systems as well as confirming the presence of <br /> various MEP equipment which was identified on design drawings. AEI's FCA <br /> survey also includes identifying discrepancies between construction drawings and <br /> as-built drawings. AEI's field inspection services are being utilized to amend the <br /> "as-built"drawings to reflect"true"conditions. <br /> Presentation: AEI utilized the Kykloud FCA data-gathering software as well as tablet data <br /> collection devices in developing detailed reports. Narrative reports will be <br /> completed, along with a database and spreadsheet of all deficiencies which <br /> included projected maintenance activities. Geocoded photos of deficiencies <br /> overlaid on maps and site plans will be provided and integrated into the FCA <br /> reports and database to be provided to the client. <br /> Date: Completed August 2019 <br /> d9 <br /> - - - -_ <br /> �90_ <br /> FUTU E SfTf DE Tiff <br /> WA NEQ1CAl Cfll�Ea <br /> City Council �� `' 21 — 3 5/3/2022 <br /> AEI Consultants <br />
The URL can be used to link to this page
Your browser does not support the video tag.