My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2022-05-03
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
05/03/2022 Special and Regular & HA
>
Agenda Packet_2022-05-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 10:10:44 AM
Creation date
4/28/2022 9:49:52 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
5/3/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D — UNDERSTANDING SCOPE OF SERVICES <br /> PROJECT STRATEGY & MANAGEMENT PLAN OVERVIEW: AEI has completed numerous FCA portfolios <br /> with multiple assets spread over substantial geographic areas. As such, both AEI and our team of <br /> professionals have learned how to effectively complete multi-site FCA portfolios in a timely and cost- <br /> effective manner. The most important lesson learned over the years is that effective planning and <br /> scheduling is critical for a successful project. Communicating with our clients and establishing <br /> expectations with regards to report format, cost categories and timing is also critical. <br /> PROJECT MOBILIZATION: Upon award of the project, AEI will obtain the necessary documentation <br /> available from the Client to include Building Plans/Blueprints, previously prepared Facility Condition <br /> Assessments, maintenance inspection reports, as well as any other pertinent documentation. At the <br /> mobilization stage of the project, AEI will also determine those team members (Refer to Section "C") <br /> who are best qualified to work on the various portions of the project. AEI will also prepare a sample <br /> report format (with narrative and photo documentation sections) for approval from the client at the <br /> mobilization stage of the project. AEI will also conduct a Needs Analysis and review the existing <br /> computerized maintenance management software application (if any). This will facilitate AEI's data <br /> collection plan and also allow us to program our data collection tablets which will be used to abstract <br /> data during field inspection work. <br /> DOCUMENTATION REVIEW: AEI will review all building plans/blueprints for each project. This plan <br /> review is being conducted to determine if there would be any latent defects in the buildings' designs <br /> which could lead to premature failures of various systems. AEI's will also perform a thorough review of <br /> previous property condition inspection reports, capital improvement plans, and building maintenance <br /> history reports to determine the effective ages of the various equipment and major building systems. <br /> AEI will use this information in conjunction with data collected from our field inspection. AEI will also <br /> review available Asbestos and LBP surveys to determine if there are any environmental concerns <br /> associated with future building renovations/capital improvements which may require abatement, and <br /> thus increase cost estimates. <br /> INTERVIEWS: After a thorough review of all available project documentation and plans, AEI will <br /> interview individuals knowledgeable about the buildings' maintenance, capital improvements and <br /> energy consumption history. Interviews with outside maintenance firms and service providers (fire <br /> alarm, elevator, plumbing, mechanical, etc.) will also be conducted from the beginning of the project <br /> through the data analysis and reporting stage. <br /> FIELD INSPECTION (CONDITION ASSESSMENT): After a comprehensive review of plans, prior reports <br /> and energy consumption data, AEI will conduct a field inspection of the buildings and grounds of each <br /> property. AEI will also tailor the field inspection based upon the document reviews conducted prior to <br /> the site visits. At a minimum, the following areas will be surveyed: <br /> • All Buildings will be surveyed (roofs, mechanical areas, common areas, cellars, basements, <br /> exteriors). <br /> • All Site areas (100%) will be surveyed <br /> • 100% of building exteriors will be surveyed <br /> • 100% of building mechanical rooms will be surveyed. <br /> • A representative sampling of building interior areas will be surveyed. Emphasis will be placed on <br /> those units which are more susceptible to damage such as corner units, top floor units, etc. <br /> • All Assets will be inventoried and the condition of same will be assessed as part of the FCA. <br /> City Council AE1 COnSUltants 5/3/2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.