My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2022-05-03
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
05/03/2022 Special and Regular & HA
>
Agenda Packet_2022-05-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 10:10:44 AM
Creation date
4/28/2022 9:49:52 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
5/3/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contractor shall hand deliver a City provided work notice letter to adjacent resident owners at least <br /> one week prior to the demolition work. <br /> Asbestos Abatement: <br /> The work described herein consists of removal and disposal of ALL asbestos containing materials <br /> (ACM-friable or nonfriable) and subsequent cleaning of the sites in accordance with all applicable <br /> federal,state and local regulations, standards and codes governing asbestos and any other trade work <br /> done in conjunction with the abatement. Results of any testing that identify asbestos containing <br /> materials will be provided by the City. It is the responsibility of the Contractor to determine if any <br /> additional asbestos removal is required in addition to the surveys. <br /> Copies of all notifications must be submitted to City including, abatement contractor's license, map <br /> and/or clear documentation specifying asbestos containing materials abated; completed waste <br /> manifests; and a completion letter indicating that all asbestos containing materials from these <br /> properties have been abated and properties are ready to be demolished. <br /> Lead Removal: <br /> The Contractor shall take all necessary precautions and follow all Occupational Safety & Health <br /> Administration(OSHA')s guidelines required in the handling of lead contained materials if any are <br /> detected. Please refer to the Lead Hazard Evaluation Report which will be provided to the Contractor <br /> prior to on-call bid. <br /> Rat and/or Vermin Abatement: <br /> Contractor,prior to performing demolition,is responsible for providing rat and/or vennin abatement. <br /> As part of the demolition completion package, written certification will be provided to the City, <br /> stating that such work was performed, and that the structures were free of infestation prior to the <br /> demolition taking place. <br /> Erosion Control: <br /> Contractor shall prepare erosion and sediment control plan immediately after award of the contract <br /> for the approval of the Engineer. The plan shall be prepared per the applicable guidelines described <br /> j in the latest version of the Orange County Program Construction Runoff Guidance Manual <br /> (http'//ocwatersheds com/documents/bmp/constructionaatiyities), The Contractor shall submit the <br /> plans for review and shall make the necessary revisions to the plans as directed by the City. The <br /> plans shall be prepared by a Civil Engineer licensed in the State of California. The City may waive <br /> the requirement of licensed Civil Engineer if the Contractor can satisfactorily prove to the City that <br /> I the person preparing the erosion control plan is qualified in the field of erosion control. <br /> i <br /> The Contractor shall keep a copy of the erosion control plan on-site for the duration of the contract <br /> and shall provide all necessary control devices to implement all necessary measures as shown on the <br /> plan.The erosion control plan shall remain in effect until approval to remove is granted by the City. <br /> i <br /> I <br /> i <br /> <br /> City Council <br /> i 22– 15 <br /> ' 5/3/2022 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.