Laserfiche WebLink
All erosion control materials shall be available on-site and stockpiled at a convenient location to <br /> facilitate rapid construction of temporary devices when rain is eminent. <br /> Fee Proposal <br /> Contractor shall submit a fee proposal as described below in a sealed fee envelope. This fee proposal <br /> shall be based on ON-CALL DEMOLITION SERVICES for the sample project site described below. <br /> The proposal will be used for fee comparison and evaluation purposes. Furthermore, this fee proposal <br /> will become part of Exhibit B of the Contract Agreement and will be used to compare with an actual <br /> task order quote requested by the City. <br /> Fee proposal shall include: <br /> c Description of work(summarized scope of services) <br /> o Fee(per spreadsheet below) <br /> o Schedule(from date of receiving a Notice to Proceed to task order completion) <br /> SUBJECT PROJECT SITE DESCRIPTION: <br /> I <br /> The subject sample project site, which was already demolished, is for comparison and evaluation <br /> purposes only. The sample project is located at 1301 W I1"' Street, Santa Ana, CA 92703. The <br /> following is a brief description of the sample project site. Please refer to Appendix-Attachment 4 for <br /> frill project site description and Asbestos,Lead-Based Paint/Universal Waste Survey. <br /> The building is one story residential structure with stucco over wood framing exterior walls with brick <br /> i fascia construction with the following approximate dimensions: <br /> - Main Dwelling Area: 1,685 sf <br /> - Garage: 390 sf <br /> Covered Patio: 275 sf <br /> - Total Area: 2,350 sf <br /> Total Land Area: 6,970 sf <br /> Contractor is responsible for demolishing all improvements, including:4"thick concrete slab foundation <br /> and footings to a depth of 3', and all surrounding landscaping. Contractor is also responsible for <br /> clearing the site, grading the parcel for drainage, capping all sewer- lines, and compacting to 90% <br /> density. Erosion control to include importing and exporting fill dirt as needed, installing straw waddles <br /> around site perimeter, topping site with 1" base course to prevent wind erosion, and installing rumble <br /> 3 plates for the duration of the demolition. <br /> 3 <br /> Price provided below shall be based solely on the information provided hereon and shall be an all- <br /> inclusive price and shall include all items listed and cover all items or work identified above and <br /> Appendix -Attachment 4 to deliver a clear site with no remaining improvements. <br /> 3 <br /> 3 <br /> 33 <br /> 3 <br /> &nbsp; <br /> City Council <br /> &nbsp;22&ndash;&nbsp;16 <br /> 5/3/2022 <br /> &nbsp; <br />