0RFQ For On-Call Demolition Service
<br /> MACRO-Z-TECHNOLOGY
<br /> List of Relevant Projects & References
<br /> Nearly all of MZT's projects include demolition and over 75 projects have included HAZMAT abatement. This
<br /> means that we've honed our skills performing demolition while preparing sites that are ready to be built upon.
<br /> The projects provided in this section represent just a sampling of our most recent experience performing
<br /> demolition and site preparation. This is work similar to the On-Call Demolition Service contract where we are
<br /> demolishing a building then cleaning up the site to leave behind a pristine, stable surface that could be used for
<br /> future development. The City of Santa Ana can be confident that this is work that we've completed successfully
<br /> for similar on-call services.
<br /> In addition to the projects provided in this section, we've completed these similar projects in the last 10 years:
<br /> • Demolition of Building 2650 A & Renovation of Building 3735 at Edwards AFB, CA (for USACE)
<br /> • Demolition of Old Paine Field Air Traffic Control Tower Building, Everett, WA (for the FAA)
<br /> • Demolish Building 351 & Renovate Building 431 at Puget Sound Naval Shipyard, Bremerton, WA (for
<br /> NAVFAC)
<br /> • Navy Band Room Demolition & Renovations at Naval Air Station North Island (NASNI), CA (for
<br /> NAVFAC)
<br /> • M Demolition of Buildings 3320B & 3320C at Naval Base San Diego, CA (for NAVFAC)
<br /> • Demolish Bead Blast Bay 12 at NASNI, CA (for NAVFAC)
<br /> • Demolish 1104 North Homer Street in Anaheim, CA (for the City of Anaheim)
<br /> • Demolish Structures at Flair Spectrum Site in El Monte, CA
<br /> Project#1.' 6. Demolition of 872-SFestroom Facility at Peter Marshall Park
<br /> Location: Anaheim CA Year Completed: 2018 <<within last 5 years
<br /> .........._...._........................................................................................._..._........................... .---..._............_..._.. _._. _..............._....................................._._................
<br /> Project Description
<br /> This immediate-response project included the demolition of a 205-SF
<br /> restroom structure, the 4" deep 205-SF concrete slab, 462-SF of concrete Relevant Scope items:
<br /> paving, and electrical wiring placed within a traffic-rated concrete pull box; demolition, asbestos
<br /> the removal of building, block walls, capping of sewer laterals, abatement, HAZMAT
<br /> disconnection and capping of utility services and appurtenant removal, grading for
<br /> improvements, as well as the removal and disposal of asbestos-and lead drainage, importing &
<br /> paint-containing building materials found in structures and exporting fill, cap of water&
<br /> improvements at the facility. The removal and salvage of chain link fencing sewer lines, compacting
<br /> appurtenances and installation of temporary chain link fences, driveway Demolition of: foundations,
<br /> gate, and walk gate were also included. Additional project scope involved footings, slabs, fencing,
<br /> minor grading, disposal of all material and debris, and site clean-up. walls
<br /> MZT implemented appropriate stormwater control per a Stormwater - Completed within 5 years
<br /> Pollution Prevention Plan (SWPPP) in accordance with NPDES and Performed as Prime
<br /> CASQA, as well as erosion control measures. Contractor
<br /> Public Agency
<br /> This project was Work Order No. 5 under Master Agreement 9617 with the On-Call Rapid Response
<br /> City of Anaheim for the Demolition, Disposal/Debris Removal, Erosion and Contract
<br /> Sediment Control, and Immediate Response for As-Needed Services.
<br /> Similar Size, Scope, and Complexity
<br /> Similar Size. At 872-SF of demolition and $56.9-K, this is similar in size to the structures to be demolished
<br /> under the City's On-Call Demolition Services contract.
<br /> Similar Scope. This project included: asbestos abatement, HAZMAT removal, grading for drainage,
<br /> importing & exporting fill, cap of water& sewer lines, compacting, and demolition of: foundations, slabs,
<br /> fencing, and walls.
<br /> Similar Complexity. This project is similar in complexity due to being awarded from an on-call demolition
<br /> services contract just like the proposed contract for the City of Santa Ana. Our experience with on-call demo
<br /> services ensures that the City will receive a contractor already familiar with the quick-response and
<br /> mobilization procedures for projects similar in size and scone.