Laserfiche WebLink
0RFQ For On-Call Demolition Service <br /> MACRO-Z-TECHNOLOGY <br /> List of Relevant Projects & References <br /> Nearly all of MZT's projects include demolition and over 75 projects have included HAZMAT abatement. This <br /> means that we've honed our skills performing demolition while preparing sites that are ready to be built upon. <br /> The projects provided in this section represent just a sampling of our most recent experience performing <br /> demolition and site preparation. This is work similar to the On-Call Demolition Service contract where we are <br /> demolishing a building then cleaning up the site to leave behind a pristine, stable surface that could be used for <br /> future development. The City of Santa Ana can be confident that this is work that we've completed successfully <br /> for similar on-call services. <br /> In addition to the projects provided in this section, we've completed these similar projects in the last 10 years: <br /> • Demolition of Building 2650 A & Renovation of Building 3735 at Edwards AFB, CA (for USACE) <br /> • Demolition of Old Paine Field Air Traffic Control Tower Building, Everett, WA (for the FAA) <br /> • Demolish Building 351 & Renovate Building 431 at Puget Sound Naval Shipyard, Bremerton, WA (for <br /> NAVFAC) <br /> • Navy Band Room Demolition & Renovations at Naval Air Station North Island (NASNI), CA (for <br /> NAVFAC) <br /> • M Demolition of Buildings 3320B & 3320C at Naval Base San Diego, CA (for NAVFAC) <br /> • Demolish Bead Blast Bay 12 at NASNI, CA (for NAVFAC) <br /> • Demolish 1104 North Homer Street in Anaheim, CA (for the City of Anaheim) <br /> • Demolish Structures at Flair Spectrum Site in El Monte, CA <br /> Project#1.' 6. Demolition of 872-SFestroom Facility at Peter Marshall Park <br /> Location: Anaheim CA Year Completed: 2018 <<within last 5 years <br /> .........._...._........................................................................................._..._........................... .---..._............_..._.. _._. _..............._....................................._._................ <br /> Project Description <br /> This immediate-response project included the demolition of a 205-SF <br /> restroom structure, the 4" deep 205-SF concrete slab, 462-SF of concrete Relevant Scope items: <br /> paving, and electrical wiring placed within a traffic-rated concrete pull box; demolition, asbestos <br /> the removal of building, block walls, capping of sewer laterals, abatement, HAZMAT <br /> disconnection and capping of utility services and appurtenant removal, grading for <br /> improvements, as well as the removal and disposal of asbestos-and lead drainage, importing & <br /> paint-containing building materials found in structures and exporting fill, cap of water& <br /> improvements at the facility. The removal and salvage of chain link fencing sewer lines, compacting <br /> appurtenances and installation of temporary chain link fences, driveway Demolition of: foundations, <br /> gate, and walk gate were also included. Additional project scope involved footings, slabs, fencing, <br /> minor grading, disposal of all material and debris, and site clean-up. walls <br /> MZT implemented appropriate stormwater control per a Stormwater - Completed within 5 years <br /> Pollution Prevention Plan (SWPPP) in accordance with NPDES and Performed as Prime <br /> CASQA, as well as erosion control measures. Contractor <br /> Public Agency <br /> This project was Work Order No. 5 under Master Agreement 9617 with the On-Call Rapid Response <br /> City of Anaheim for the Demolition, Disposal/Debris Removal, Erosion and Contract <br /> Sediment Control, and Immediate Response for As-Needed Services. <br /> Similar Size, Scope, and Complexity <br /> Similar Size. At 872-SF of demolition and $56.9-K, this is similar in size to the structures to be demolished <br /> under the City's On-Call Demolition Services contract. <br /> Similar Scope. This project included: asbestos abatement, HAZMAT removal, grading for drainage, <br /> importing & exporting fill, cap of water& sewer lines, compacting, and demolition of: foundations, slabs, <br /> fencing, and walls. <br /> Similar Complexity. This project is similar in complexity due to being awarded from an on-call demolition <br /> services contract just like the proposed contract for the City of Santa Ana. Our experience with on-call demo <br /> services ensures that the City will receive a contractor already familiar with the quick-response and <br /> mobilization procedures for projects similar in size and scone. <br />