� RFQ For On-Call Demolition Service v
<br /> MACRO.Z-TECHNOLOGY
<br /> Other similar complexities include the abatement and removal of asbestos- and lead-containing materials,
<br /> as well as temporary fencing and signage to prevent members of the public from accessing the project site
<br /> during demolition services.
<br /> .............._..._._..._................._....._..............._..._..._....._......_........................---- ---
<br /> Client: City of Anaheim Public Works Consultant Project Manager: Daniel Duarte <<Same as
<br /> Proposed PM
<br /> ............... — ------
<br /> Reference Point of Contact: Jose Jimenez, Associate Proiect Planner
<br /> Reference Phone: Reference Email: I jjimaenez_a anaheim.net
<br /> Project 2. 14.4- Immediate es or e Demolition of 8,723-SIFof Fire Damaged Homes
<br /> Location: Anaheim, CA Year Completed: 2017 <<within last 5 years
<br /> Project Description •
<br /> This immediate-response project was initiated to "Make Safe Fire
<br /> Damaged Homes" due to fires on October 9th, 2017. Residential buildings Relevant Scope items:
<br /> at 950, 954, and 970 Canyon Heights Drive in Anaheim, CA were demolition, HAZMAT
<br /> uninhabitable and in danger of collapsing after being affected by one of the removal, grading for
<br /> largest fires to hit Orange County, forcing several thousand people to drainage, importing &
<br /> evacuate Anaheim, Orange, and Tustin. exporting fill, cap of water &
<br /> Prior to the demolition of the three structures, MZT's Superintendent sewer lines, compacting
<br /> coordinated with Anaheim representatives to prepare the site for Demolition of: foundations,
<br /> mobilization and demolition activities. MZT also coordinated alongside city footings, slabs, attached
<br /> officials, Anaheim Fire Department, and the city utility department to shut garage, landscaping,
<br /> off utilities such as gas and electricity to safely demolish red-tagged homes. fencing, walls, trees
<br /> After performing a visual inspection of the structures and surrounding work Completed within 5 years
<br /> area to avoid hazardous materials and other hazards, a work zone was Performed as Prime
<br /> established for demolition and debris processing. Contractor
<br /> Public Agency
<br /> MZT then mobilized on site within hours of receiving the notification to On Call Rapid Response
<br /> begin demolition of the 8,723-SF structures by utilizing excavators to push Contract
<br /> in the outer walls, or to pull walls inward in order to prevent additional
<br /> damage to adjacent, less-damaged yellow-tagged properties. Prior to the disturbance, MZT temporarily
<br /> braced walls that could fall in the wrong direction. Damaged stud walls were demolished from the top
<br /> downward in a systematic manner with care not to buckle the wall. The roof, walls, and interior items were
<br /> demolished inward toward the center of the foundation. Debris was consolidated on the slab as directed by
<br /> the City of Anaheim.
<br /> During demolition, MZT utilized a water truck and water hose to direct a localized water spray to the source
<br /> of demolition activities, thereby reducing airborne dust particles. The water supply was only used as needed
<br /> to minimize run-off. MZT cleaned up the access to the work area of all debris generated from demolition
<br /> activities and turned the site back to the City.
<br /> This project was awarded under the Demolition, Disposal/Debris Removal, Erosion & Sediment Control &
<br /> Immediate Response Master Agreement with the City.
<br /> Similar Size, Scope, and Complexity
<br /> Similar Size. At 8,723-SF of demolition and $14.4-K, this is similar in size to the structures to be demolished
<br /> under the City's On-Call Demolition Services contract.
<br /> Similar Scope. This project included: demolition of building structure and exterior site features, HAZMAT
<br /> removal, site grading for drainage, and response within a local region.
<br /> Similar Complexity. This rapid-response project is similar to On-Call services contracts in that we must be
<br /> ready to hit the ground running at the Notice to Proceed, which could come at any time, and mobilize as
<br /> quickly as possible. MZT is always prepared to tackle complex and time-sensitive work, and will be ready to
<br /> take on whatever demolition project is needed by the City of Santa Ana.