Laserfiche WebLink
� RFQ For On-Call Demolition Service v <br /> MACRO.Z-TECHNOLOGY <br /> Other similar complexities include the abatement and removal of asbestos- and lead-containing materials, <br /> as well as temporary fencing and signage to prevent members of the public from accessing the project site <br /> during demolition services. <br /> .............._..._._..._................._....._..............._..._..._....._......_........................---- --- <br /> Client: City of Anaheim Public Works Consultant Project Manager: Daniel Duarte <<Same as <br /> Proposed PM <br /> ............... — ------ <br /> Reference Point of Contact: Jose Jimenez, Associate Proiect Planner <br /> Reference Phone: Reference Email: I jjimaenez_a anaheim.net <br /> Project 2. 14.4- Immediate es or e Demolition of 8,723-SIFof Fire Damaged Homes <br /> Location: Anaheim, CA Year Completed: 2017 <<within last 5 years <br /> Project Description • <br /> This immediate-response project was initiated to "Make Safe Fire <br /> Damaged Homes" due to fires on October 9th, 2017. Residential buildings Relevant Scope items: <br /> at 950, 954, and 970 Canyon Heights Drive in Anaheim, CA were demolition, HAZMAT <br /> uninhabitable and in danger of collapsing after being affected by one of the removal, grading for <br /> largest fires to hit Orange County, forcing several thousand people to drainage, importing & <br /> evacuate Anaheim, Orange, and Tustin. exporting fill, cap of water & <br /> Prior to the demolition of the three structures, MZT's Superintendent sewer lines, compacting <br /> coordinated with Anaheim representatives to prepare the site for Demolition of: foundations, <br /> mobilization and demolition activities. MZT also coordinated alongside city footings, slabs, attached <br /> officials, Anaheim Fire Department, and the city utility department to shut garage, landscaping, <br /> off utilities such as gas and electricity to safely demolish red-tagged homes. fencing, walls, trees <br /> After performing a visual inspection of the structures and surrounding work Completed within 5 years <br /> area to avoid hazardous materials and other hazards, a work zone was Performed as Prime <br /> established for demolition and debris processing. Contractor <br /> Public Agency <br /> MZT then mobilized on site within hours of receiving the notification to On Call Rapid Response <br /> begin demolition of the 8,723-SF structures by utilizing excavators to push Contract <br /> in the outer walls, or to pull walls inward in order to prevent additional <br /> damage to adjacent, less-damaged yellow-tagged properties. Prior to the disturbance, MZT temporarily <br /> braced walls that could fall in the wrong direction. Damaged stud walls were demolished from the top <br /> downward in a systematic manner with care not to buckle the wall. The roof, walls, and interior items were <br /> demolished inward toward the center of the foundation. Debris was consolidated on the slab as directed by <br /> the City of Anaheim. <br /> During demolition, MZT utilized a water truck and water hose to direct a localized water spray to the source <br /> of demolition activities, thereby reducing airborne dust particles. The water supply was only used as needed <br /> to minimize run-off. MZT cleaned up the access to the work area of all debris generated from demolition <br /> activities and turned the site back to the City. <br /> This project was awarded under the Demolition, Disposal/Debris Removal, Erosion & Sediment Control & <br /> Immediate Response Master Agreement with the City. <br /> Similar Size, Scope, and Complexity <br /> Similar Size. At 8,723-SF of demolition and $14.4-K, this is similar in size to the structures to be demolished <br /> under the City's On-Call Demolition Services contract. <br /> Similar Scope. This project included: demolition of building structure and exterior site features, HAZMAT <br /> removal, site grading for drainage, and response within a local region. <br /> Similar Complexity. This rapid-response project is similar to On-Call services contracts in that we must be <br /> ready to hit the ground running at the Notice to Proceed, which could come at any time, and mobilize as <br /> quickly as possible. MZT is always prepared to tackle complex and time-sensitive work, and will be ready to <br /> take on whatever demolition project is needed by the City of Santa Ana. <br />