My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2022-05-03
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
05/03/2022 Special and Regular & HA
>
Agenda Packet_2022-05-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 10:10:44 AM
Creation date
4/28/2022 9:49:52 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
5/3/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0RFQ For On-Call Demolition Service <br /> MACRO-Z-TECHNOLOGY <br /> Part 2 I Scope of Services & Schedule <br /> Proposal shall include a Scope oj'Services and Schedule which details the work phases to be <br /> completed, the tasks to be accomplished, the deliverables to be provided, and the schedule / timeline <br /> to complete the project, based upon the requested Scope of Work detailed in Attachment 1 oj'this RFP. <br /> The scope of services and schedule outlined below is tailored specifically to the sample project, demolition of <br /> 1301 W. 111h Street, Santa Ana, CA. This scope includes the work phases to be completed, the tasks to be <br /> accomplished in each phase, and deliverables to be provided. Following the scope of services is a graphic <br /> schedule that shows the schedule/timeline to complete the project. <br /> 2.1 Phase 1: Request for TO Quote <br /> • The City has provided a request for TO quote as part of this RFQ. <br /> • MZT has reviewed the documents provided and submitted RFIs to clarify scope items. <br /> • Since the project is already completed, we couldn't attend a site visit. However, we used Google Earth <br /> Pro to review historical satellite imagery of the project site. <br /> • Our response is included herein, and includes a fee schedule, scope of services summary, and work <br /> schedule from NTP to TO completion. Note that this phase is not reflected on the attached schedule <br /> because the schedule covers activities after NTP. <br /> • Fee schedule <br /> • Scope of services summary <br /> • Work schedule <br /> 2.2 Phase 2: Pre-Demolition Preparation & Mobilization <br /> 2. .1 Task 2.1: Pre-Demolition Preparation <br /> • Hold a preconstruction meeting with the City to confirm expectations, site contacts, and schedule <br /> • Obtain a demolition permit and a plumbing permit for utility capping, if applicable <br /> • Prepare & submit a demolition and grading plan (including schedule) to the City <br /> • Schedule water and sewer cap inspections with the City <br /> • Coordinate with utility owners (e.g., call Dig Alert 811) to identify, locate, and mark utilities <br /> o For this project, we will need to schedule power, water, sewer, and gas shut off <br /> o Coordinate with Southern California Edison to schedule power removal <br /> o Coordinate with So Cal Gas for capping the gas line <br /> o Coordinate with the water company (Santa Ana Municipal Utility Services Section) to schedule <br /> capping for the water and sewer lines <br /> • Concurrent with utility coordination, submit the AQMD notification (14-day notice, if applicable) <br /> • Hand out City-provided demolition notices to the project's neighbors <br /> • Preconstruction meeting agenda and minutes' <br /> • Demolition permit <br /> • Demolition and grading plan <br /> .2.2 Task 2.2. Mobilization <br /> • Reach out to subcontractors to line up abatement support <br /> • Allocate internal resources (equipment, manpower, tools, materials, supplies) <br /> o Specific equipment and materials are mobilized to the site when needed <br /> o This keeps the site more organized, which is better for safety <br /> o See Table 2 for the equipment, crew, tools, and materials I supplies we anticipate using for the <br /> sample project <br /> • Erect site fence <br /> • Install SWPPP/ BMPs (straw wattle, silt fence, rumble plate(s)) <br />
The URL can be used to link to this page
Your browser does not support the video tag.