Laserfiche WebLink
0 <br /> RFQ For On-Call Demolition Service <br /> MACRO-Z-TECHNOLOGY <br /> • MMEMEMEEM . . U. I. <br /> • Skidsteer with . 1 Superintendent • Sledgehammers • Standard PPE (eye <br /> grappler bucket . 2 Operators • Hammers protection, gloves, <br /> • End-dump or super- • 4 Laborers • Jack hammers vests, etc.) <br /> 10 truck(depending . Subcontractor's • Pry bar • Abatement PPE for <br /> on exact access abatement crew • reciprocating saw the abatement crew <br /> based on permit& (foreman and 4 T vek suits <br /> plan developed after laborers) • Air compressor res respirators) <br /> award Chain saws p <br /> • Weed eaters • Poly sheeting <br /> • 40-yard dumpster . Traffic control devices <br /> • 50,000-LB excavator Saws (various <br /> types/sizes) (cones, stanchions, <br /> • Shovels (various delineators, arrow <br /> types/sizes) boards, etc.) <br /> • Walk-off matts <br /> • SWPPP/BMP <br /> materials <br /> Table 2. Equipment, crew, tools, and materials/supplies anticipated for the sample project <br /> .3 Phase 3: Perform the Work <br /> .3.1 Task .1: Abatement <br /> • Prior to starting work, we'll provide required notice to the US EPA and CARB <br /> • We'll start with removing the bees so that the site is safe for abatement workers. We'll call a local bee <br /> keeper to safely remove the hive without damaging the bee population. <br /> • A qualified pest control subcontractor will abate vermin, using methods appropriate to the species and <br /> locations encountered <br /> • Erect asbestos and lead abatement containment (poly sheeting securely duct taped in place with <br /> entrance vestibule and negative air pressure maintained inside) <br /> • Qualified subcontractor abates the Asbestos Containing Materials (ACM), securely containing ACM <br /> inside poly and transporting off-site <br /> o <br /> • Abatement contractor's license <br /> • Map and documentation specifying the ACM abated <br /> • Hazardous materials transport/disposal manifests <br /> • Completion letter indicating that the property has been abated& is ready for demolition <br /> 2. .2 Task 3.2: Salvage & DemolishExterior Site Features <br /> • To save time, we perform site salvage & demolition concurrent with interior abatement <br /> • Pothole and cap utilities based on coordination efforts during the pre-demolition preparation phase <br /> • Salvage opportunities would be evaluated based on the project <br /> • Using heavy equipment and hand tools, remove landscaping and trees and mulch if possible, covered <br /> patio, and exterior paving <br /> • Haul-off operations conducted as needed to maintain site cleanliness <br /> 2.3.3 Task . o Salvage & Demolish Building Interior <br /> • Salvage opportunities would be evaluated based on the project <br /> • Using hand tools, demolish building interior features, including non-load-bearing walls, cabinets, <br /> fixtures, drywall, HVAC, electrical, and plumbing. <br /> . .4 Task .4a Salvage & Demolish Building Exterior <br /> • Safely demolish and remove building structural walls. <br /> o Either by deconstruction where we carefully remove structural elements from the top down, or <br /> by using heavy equipment to push structural members toward the center of the property. <br />