My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2022-05-03
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
05/03/2022 Special and Regular & HA
>
Agenda Packet_2022-05-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 10:10:44 AM
Creation date
4/28/2022 9:49:52 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
5/3/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Nf <br /> „ � RFQ For On-Call Demolition Service <br /> MACRO-Z-TECHNOLOGY <br /> c Exact method is determined based on project site features, such as proximity to the property <br /> line or other buildings, structural soundness of uncovered wood framing material, and <br /> maneuvering space on the site. <br /> • Using a excavator equipped with a hydraulic hammer attachment, we'll break up the 4" concrete <br /> foundation and footings and haul away to recycler. <br /> • Using a backhoe equipped with a bucket attachment, we'll excavate the building footings to a depth of <br /> 3'. <br /> • Haul-off operations conducted as needed to maintain site cleanliness <br /> 2.3.5 Task 3.5e Site Restoration <br /> • Import soil to backfill the excavated building foot print, placing the soil in lifts and compacting to 90% <br /> density. <br /> • Rough grade then fine grade the site to meet the grading plan requirements for proper drainage. <br /> • Top with 1" base course. <br /> 2.4 Phase 4: Closeout & Demobilization <br /> • Remove equipment, tools, and materials from the site <br /> • Conduct final site cleaning, ensuring that no tools, materials, or debris is left on-site <br /> • Conduct internal final inspections/ punchlist to ensure all work was completed in accordance with the <br /> scope and quality standards <br /> • Conduct final inspections with the City to closeout the permits <br /> • Conduct final inspections / punchlist with the City to closeout the project <br /> • Remove temporary SWPPP / BMP features (silt fence, rumble plates) <br /> • Remove site fence <br /> ■ <br /> • Copies of demolition permit, water and sewer cap inspection approval, and letter of completion <br /> Certification that the structure was free of infestation prior to demolition <br /> 2.5 Sample Project Schedule <br /> In our attached sample project schedule, you may notice that these phases aren't exactly in a linear <br /> progression from Phase 2 to Phase 3, and Phase 3 to Phase 4. That is because we adapted our standard plan <br /> to suit this sample project. <br /> In this case, we complete abatement before mobilizing any heavy equipment. We chose this approach for the <br /> sample project because we anticipate some site constraints, specifically that we won't have much room for <br /> maneuvering heavy equipment alongside an abatement operation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.