My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2022-05-03
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
05/03/2022 Special and Regular & HA
>
Agenda Packet_2022-05-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 10:10:44 AM
Creation date
4/28/2022 9:49:52 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
5/3/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTERIOR DEMOLITION, INC, City of Santa Ana <br /> ASBESTOS ABATEMENT PLAN JOB 1301 W 11th St <br /> Santa Ana,CA 92703 <br /> V. Work Area Preparation <br /> A Electrical Service and HVAC <br /> 1. The Contractor shall provide temporary lighting sources and ensure safe installation <br /> (including ground faulting) of temporary lighting sources and any additional electrical <br /> equipment to be used by the Contractor, in compliance with all applicable electrical <br /> code requirements and Cal/OSHA requirements for temporary electrical systems. <br /> 2. The Contractor shall utilize temporary electrical service or generator; ensure safe <br /> installing of connections and extensions cords (including ground fault interruption <br /> connections),temporary electrical service, and any additional electrical equipment to be <br /> used by the Contractor, in compliance with all applicable electrical code requirements <br /> and Cal/OSHA requirements for temporary electrical systems. <br /> B. Decontamination Units <br /> 1, One (1) decontamination unit shall be required at each asbestos control <br /> area. It will comply with the following guidelines: <br /> a. Three (3)-stages of decontamination shall be provided, consisting of a <br /> clean room, equipment/dirty room, and shower. This area shall be <br /> constructed of 6-mm polyethylene sheeting and PVC pipe at a <br /> minimum. <br /> b. The floor shall be covered where the decontamination unit will be <br /> placed with two (2) layers of 6-mm polyethylene prior to set-up of unit. <br /> c. A single entry and exit to each work area shall be provided. <br /> d. Each of the three (3)stages shall be separated from each other and <br /> the abatement area by a plastic flap constructed 6-mil poly sheeting <br /> that allow for the flow of air through the clean room and shower room. <br /> 2_ The Equipment Room shall be of sufficient size for storage of all equipment, <br /> disposal facilities for contaminated clothing, and allow for removal of such <br /> clothing by employees. <br /> 3. The Clean Room shall be of adequate size to allow employees to don <br /> abatement gear. Storage facilities for street clothing and respirators will be <br /> provided. Towels will be available in this area, for use after showering. <br /> C. Typical Containment Construction <br /> 1. All materials shall be delivered in the original packages, containers, or bundles <br /> bearing the name of the manufacturer and brand name. <br /> 2. All materials shalt be stored off the ground,away from wet or damp surfaces, <br /> and under cover sufficient enough to prevent damage or contamination. <br /> Damaged, deteriorating,or previously used materials shall not be used and <br /> shall be removed from the work site and disposed of properly. <br /> 3. The Contractor shall shut down and lock out the HVAC and electrical system <br /> for the work area. The Contractorshall provide temporary lighting sourcesand <br /> ensure safe installation(including ground faulting)of temporary lighting sources <br /> and any additional electrical equipment to be used by the Contractor, in <br /> compliance with all applicable electrical code requirements and Cal/OSHA <br /> requirements for temporary electrical systems <br /> 4. Work areas shall be isolated from non-work areas by installing delineators and <br /> caution tape 20' beyond entire building perimeter. <br /> 5. Signs shall be posted at the entrance to each work area stating as follows; <br /> City Council Page 5 of g2 — 123 5/3/2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.