Laserfiche WebLink
INTERIOR DEMOLITION,INC. City of Santa Ana <br /> ASBESTOS ABATEMENT PLAN 1301 W 11th St <br /> Santa Ana,CA 92703 <br /> DANGER <br /> ASBESTOS CONTAMINATION <br /> Respirators and Protective Clothing <br /> Must Be Worn by All Personnel Entering This Area <br /> VI. Work.PrAcUces <br /> A Access to Work Area <br /> I. Worker entry and exit into each contaminated area shall be controlled by use of <br /> an entry/exit fog. Inspectors and supervisors shall also sign the log as evidence <br /> of entry into the area. <br /> B. Abatement Guidelines <br /> 1, Abatement is to commence only after the site supervisor has determined that <br /> the restricted area is established and clearly marked. The following removal <br /> steps/phases have been presented as a logical sequence of events; the work <br /> should follow this sequence: <br /> O Removal Steps -Asbestos <br /> 1. Adequate wetting. Using an airless sprayer capable of delivering a fine low <br /> pressure mist,wet the ACM with amended water, fashion glove bag <br /> containment <br /> 2. Removal of Asbestos Containing Materials (ACM). <br /> a. Remove ACM in manageable section while the material is still wet. <br /> b. Use HEPA filtered vacuums to collect all ACM debris and dust/dirt <br /> containing ACM. <br /> C. Promptly clean up and dispose of ACM waste in leak-proof containers. <br /> Prohibited Activities During ACM Removal <br /> ■ Use of high speed abrasive disc saws, sanders, drills, or other power <br /> tools that are not equipped with point-of-cut dust collection systems that <br /> are attached to HEPA filtered vacuums. <br /> • Use of compressed air to remove asbestos. <br /> • Removal of ACM while it is dry or when it has not been adequately <br /> wetted. <br /> * Dry sweeping, shoveling, or other dry clean-up of ACM,or dust/dirl <br /> containing ACM. <br /> 3. Removal of Tools and Equipment <br /> a. Thoroughly HEPA vacuum and wet wipe tools and otherequipment <br /> before removing from work area. <br /> b. Any power tools that cannot be completely de-conlaminated must be <br /> placed in pre-labeled plastic bags and seated with duct tape before <br /> removing from work area. <br /> C. Hand tolls such as scrapers, broad knives, etc., can be cleaned by wet <br /> wiping and are to be bagged prior to removal from the work area. <br /> City Council Page 6 of W2 — 124 5/3/2022 <br />