My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2022-05-17
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
05/17/2022 Special and Regular
>
Agenda Packet_2022-05-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2022 3:10:44 PM
Creation date
5/16/2022 2:16:05 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
5/17/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1584
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FINAL DRAFT PRELIMINARY REPORT <br />(Connections to EOCF #2) <br />The pressure reducing facility can be located within Heim Ave. cul-da-sac in the vicinity of the existing OC-No. 40 <br />MWD service connection. The PR facility is recommended to be located in the existing public parkway right-of- <br />way or it could be located within the street if there is open utility corridor. By locating the facility within Heim <br />Ave. there will be minimal impact on traffic on Tustin Ave. <br />Figure 5 also shows the proposed MWD connection facilities at Heim Ave. and Tustin Ave. These proposed facilities <br />will include: proposed meter flow control vault with 16-inch modulating butterfly valve and magnetic flow meter; <br />connection to the existing piping between the meter vault and connection vault, including one 16-inch valve <br />(downstream side of the flow control vault) and one valve matching size of piping between the connection and <br />the existing OC-40 meter vault; and new electrical and SCADA control facilities. The proposed flow control vault <br />is recommended to be located in the existing public parkway right-of-way within Heim Ave. cul-da-sac or it could <br />be located within the street if there is open utility corridor. By locating the facility within Heim Ave. there will be <br />minimal impact on traffic on Tustin Ave. <br />5.5 City of Tustin <br />Walnut Well Site <br />Figure 6 shows the facility location and the corresponding proposed conveyance piping. The following is the <br />proposed alignment: Walnut Ave to Newport Lane to OC-43 meter vault. Assuming 5 cfs excess groundwater, the <br />EOCF#2 Discharge Water Main is proposed to be 12-inches in diameter and rated for 200 psi. The pressure <br />reducing facility can be located within Walnut Ave. in the vicinity of the existing OC-43 MWD service connection. <br />The PR facility is recommended to be located in the existing public parkway right-of-way or within an easement <br />adjacent to the parkway. If not feasible or easement is difficult to obtain, it could be located within the street if <br />there is open utility corridor. <br />Figure 6 also shows the proposed MWD connection facilities at Newport Lane and Walnut Ave. These proposed <br />facilities will include: proposed meter flow control vault with 12-inch modulating butterfly valve and magnetic <br />flow meter; connection to the existing piping between the meter vault and connection vault, including one 12- <br />inch valve (downstream side of the flow control vault) and one valve matching size of piping between the <br />connection and the existing OC-43 meter vault; and new electrical and SCADA control facilities. In addition, the <br />City of Tustin stated that the existing meter vault needs to be upgraded at the same time. The proposed flow <br />control vault is recommended to be located in the existing public parkway right-of-way or within an easement <br />adjacent to the parkway. If not feasible or easement is difficult to obtain, it could be located within the street if <br />there is open utility corridor. <br />Pasadena Well Site <br />Figure 6 also shows the facility location and the corresponding proposed conveyance piping for the Pasadena Well. <br />The following is the proposed alignment: 2nd Street to Myrtle Ave. to Main St. to B St. to Walnut Ave. to Newport <br />Lane to OC-43 meter vault. Assuming 4 cfs excess groundwater, the EOCF#2 Discharge Water Main is proposed <br />to be 12-inches in diameter and rated for 200 psi. It should be noted that this proposed alignment includes the <br />bore/jack of the Santa Ana Freeway on B Street (about 500 feet in length). The pressure reducing facility can be <br />located within Walnut Ave. in the vicinity of the existing OC-43 MWD service connection. The PR facility is <br />recommended to be located in the existing public parkway right-of-way or within an easement adjacent to the <br />parkway. If not feasible or easement is difficult to obtain, it could be located within the street if there is open <br />utility corridor. <br />Figure 6 also shows the proposed MWD connection facilities at Newport Lane and Walnut Ave. These proposed <br />facilities will include: proposed meter flow control vault with 12-inch modulating butterfly valve and magnetic <br />flow meter; connection to the existing piping between the meter vault and connection vault, including one 12- <br />inch valve (downstream side of the flow control vault) and one valve matching size of piping between the <br />connection and the existing OC-43 meter vault; and new electrical and SCADA control facilities. <br />Orange 9tq%9 1District/Moulton Niguel Water District 30 - 27 5/17/2tIMA TECH <br />Evaluation of Groundwater Conveyance Options 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.