Laserfiche WebLink
FINAL DRAFT PRELIMINARY REPORT <br />(Connections to EOCF #2) <br />In addition, the City of Tustin stated that the existing meter vault needs to be upgraded at the same time. The <br />proposed flow control vault is recommended to be located in the existing public parkway right-of-way or within <br />an easement adjacent to the parkway. If not feasible or easement is difficult to obtain, it could be located <br />within the street if there is open utility corridor. <br />The option of locating the proposed pump station at the Pasadena Well site is not recommended due to the site <br />restrictions at the well site, the long conveyance piping and the bore and jack of the Santa Ana Freeway. <br />6. REQUIRED PERMITS, LAND ACQUISITION AND EASEMENTS <br />6.1 City of Santa Ana <br />East Station Facility will not require any land acquisitions as all of the proposed facilities are located within the <br />City of Santa Ana property or public right-of-way. The only easement that may be required would be at the <br />proposed connection to the SA-7 MWD meter vault facility for construction of the vault in the adjacent <br />landscaping area to the public parkway. City of Santa Ana encroachment permit will be required for the <br />conveyance piping. Traffic control will be a major concern for the City for the pipeline work in S. Grand Ave. and <br />Ritchey St. <br />Cambridge Station Facility will not require any land acquisitions as all of the proposed facilities are located within <br />the City of Santa Ana property or public right-of-way. The only easement that may be required would be at the <br />proposed connection to the SA-6 MWD meter vault facility for construction of the vault in the adjacent <br />landscaping area to the public parkway. City of Santa Ana encroachment permit will be required for the <br />conveyance piping. Traffic control will be a major concern for the City for the pipeline work in Fairhaven and <br />Tustin Ave. <br />6.2 City of Orange <br />City Yard Facility and the Batavia Plan will not require any land acquisitions as both of the proposed facilities are <br />located within the City of Orange properties or public right-of-way. The only easement that may be required <br />would be at the proposed connection to the OC No. 42 MWD meter vault facility for construction of the vault in <br />the adjacent landscaping area to the public parkway. City of Orange encroachment permit will be required for <br />the conveyance piping for both options. Traffic control will be a major concern for the City for the pipeline work <br />in and or crossing Tustin Ave. as well as the railroad bore and jack operation at Olive Road and Fletcher Avenue. <br />An Orange County Flood Control District and Army Corp or Fish and Game Permit will be required for crossing the <br />Santiago Creek. In addition, an Orange County Flood Control District will be required for crossing of the existing <br />culvert on Fletcher Avenue and a railroad permit for the railroad crossing at Olive Road and Fletcher Avenue. <br />6.3 City of Tustin <br />Walnut Well Facility will not require any land acquisitions as all of the proposed facilities are located within the <br />City of Tustin properties or public right-of-way. The only easement that may be required would be at the proposed <br />connection to the OC No. 43 MWD meter vault facility for construction of the vault in the adjacent landscaping <br />area to the public parkway. A City of Tustin encroachment permit will be required for the conveyance piping. <br />Traffic control will be a major concern for the City for the pipeline work in Walnut Ave. and for the pump station <br />construction that will impact Red Hill Ave. <br />7. ESTIMATE OF PROBABLE CONSTRUCTION COSTS <br />7.1 Probable Construction Costs <br />The preliminary estimates of the probable construction costs for each of the proposed locations and facilities are <br />summarized in Appendix D. Construction costs were based on the experience of our engineers, construction cost <br />estimates recently prepared for similar projects, recently bid projects of a similar nature for the cities or other <br />agencies, and industry standards. <br />Orange 9t9%9 1District/Moulton Niguel Water District 30 - 28 5/17/2tIMA TECH <br />Evaluation of Groundwater Conveyance Options 16 <br />