My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2022-05-17
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
05/17/2022 Special and Regular
>
Agenda Packet_2022-05-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2022 3:10:44 PM
Creation date
5/16/2022 2:16:05 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
5/17/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1584
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Orange - City Yard <br />12 cfs Excess Groundwater <br />Item No. <br />Description <br />Quantity <br />Units <br />Unit Cost <br />Item Cost <br />1 <br />Mobilization/Demobilization/Miscellaneous <br />1 <br />LS <br />$ 1,310,000 <br />$ <br />1,310,000 <br />2 <br />EOCF#2 PS (4 pumps - 250 hp motors) w/ 2 Surge Tanks <br />1 <br />LS <br />$ 3,000,000 <br />$ <br />3,000,000 <br />3 <br />New Well with Chlorination Treatment <br />1 <br />LS <br />$ 3,400,000 <br />$ <br />3,400,000 <br />4 <br />Reservoir Piping/Almond Ave Connections <br />1 <br />LS <br />$ 110,000 <br />$ <br />110,000 <br />5 <br />18-inch EOCF#2 Water Main <br />2,440 <br />LF <br />$ 360 <br />$ <br />878,400 <br />6 <br />18-inch EOCF#2 Water Main (Arterial Street) <br />1,500 <br />LF <br />$ 480 <br />$ <br />720,000 <br />7 <br />18-inch Bore & Jack of Santiago Creek <br />400 <br />LF <br />$ 2,000 <br />$ <br />800,000 <br />8 <br />Pavement Replacement (Grind and Cap) <br />160,000 <br />SF <br />$ 3 <br />$ <br />480,000 <br />9 <br />Pressure Reducing Facility <br />1 <br />LS <br />$ 189,600 <br />$ <br />189,600 <br />10 <br />18-inch Meter Flow Control Vault <br />1 <br />LS <br />$ 200,000 <br />$ <br />200,000 <br />11 <br />Connection to OC-42 Piping including two Valves <br />1 <br />LS <br />$ 200,000 <br />$ <br />200,000 <br />12 <br />Electrical and Scada Control Facilities <br />1 <br />LS <br />$ 100,000 <br />$ <br />100,000 <br />13 <br />12-inch Distribution System Improvements (Lincoln St) <br />700 <br />LF <br />$ 280 <br />$ <br />196,000 <br />14 <br />Connections at Almond and Chapman <br />2 <br />EA <br />$ 50,000 <br />$ <br />100,000 <br />15 <br />12-inch Distribution Improvements - Phased (Chapman) <br />800 <br />LF <br />$ 420 <br />$ <br />336,000 <br />16 <br />12-inch Bore & Jack on Chapman <br />600 <br />LF <br />$ 1,800 <br />$ <br />1,080,000 <br />SUBTOTAL <br />$ <br />13,100,000 <br />30% <br />CONTINGENCY <br />$ <br />3,900,000 <br />TOTAL $ 17,000,000 <br /> <br />City Council <br /> 30 – 54 <br />5/ 17/2022 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.