My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2022-05-17
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
05/17/2022 Special and Regular
>
Agenda Packet_2022-05-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2022 3:10:44 PM
Creation date
5/16/2022 2:16:05 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
5/17/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1584
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Orange - Batavia Plant <br />7 cfs Excess Groundwater <br />Item No. <br />Description <br />Quantity <br />Units <br />Unit Cost <br />Item Cost <br />1 <br />Mobilization/Demobilization/Miscellaneous <br />1 <br />LS <br />$ 1,300,000 <br />$ <br />1,300,000 <br />2 <br />Demolition of Existing Steel Tank <br />1 <br />LS <br />$ 400,000 <br />$ <br />400,000 <br />3 <br />Demolition of Existing Pump Station <br />1 <br />LS <br />$ 200,000 <br />$ <br />200,000 <br />4 <br />Abandon/Demolish Existing Well No. 1 <br />1 <br />LS <br />$ 200,000 <br />$ <br />200,000 <br />5 <br />EOCF#2 PS (3 pumps - 200 hp motors) w/ 2 Surge Tanks <br />1 <br />LS <br />$ 2,800,000 <br />$ <br />2,800,000 <br />6 <br />New Well with Chlorination Treatment <br />1 <br />LS <br />$ 3,400,000 <br />$ <br />3,400,000 <br />7 <br />Piping Connections (Batavia) <br />1 <br />LS <br />$ 52,000 <br />$ <br />52,000 <br />8 <br />16-inch EOCF#2 Water Main <br />8,400 <br />LF <br />$ 320 <br />$ <br />2,688,000 <br />9 <br />16-inch EOCF#2 Bore & Jack (culvert/railroad/Tustin) <br />400 <br />LF <br />$ 2,000 <br />$ <br />800,000 <br />10 <br />Pavement Replacement (Grind and Cap) <br />200,000 <br />SF <br />$ 3 <br />$ <br />600,000 <br />11 <br />Pressure Reducing Facility <br />1 <br />LS <br />$ 180,000 <br />$ <br />180,000 <br />12 <br />16-inch Meter Flow Control Vault <br />1 <br />LS <br />$ 200,000 <br />$ <br />200,000 <br />13 <br />Connection to OC-40 Piping including two Valves <br />1 <br />LS <br />$ 180,000 <br />$ <br />180,000 <br />14 <br />Electrical and Scada Control Facilities <br />1 <br />LS <br />$ 100,000 <br />$ <br />100,000 <br />SUBTOTAL <br />$ <br />13,100,000 <br />30% <br />CONTINGENCY <br />$ <br />3,900,000 <br />TOTAL $ 17,000,000 <br /> <br />City Council <br /> 30 – 55 <br />5/ 17/2022 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.