Laserfiche WebLink
TRAIL CORRIDOR CONNECTIVITY <br />Data shows that trail use is one of the top <br />recreation activities in California. Moreover, <br />trail use has increased in most communities <br />since the start of the COVID-19 pandemic. <br />In Santa Ana, several City departments <br />collaborate to support Santa Ana's non - <br />motorized transportation network, including <br />on- and off-street pedestrian and bicycle <br />routes and trails (Class I, II, III, IV bikeways). <br />Within this broader network, the City of Santa <br />Ana maintains a 12.8 mile network of off-street <br />(Class 1) trail corridors for recreation. However, <br />the City lacks interconnected, off-street hike <br />and bike opportunities. <br />Trail corridors do not replace park space, but <br />they do provide recreation space and can <br />improve bike and pedestrian access to parks <br />and other destinations. Some trail corridors <br />also provide amenities such as benches, play <br />elements, fitness equipment, par courses or <br />similar park -like amenities. Investing in the <br />development of trail corridors is, for this reason, <br />a cost effective means of extending the reach <br />of existing parks and supporting recreation. <br />The PMP evaluated existing and proposed <br />Class I and Class IV bike trails to identify <br />priority connections that would support <br />recreation in unserved areas and improve <br />access to parks. Map 4-3 illustrates these key <br />trail needs. The map shows: <br />City Council <br />• Proposed Key Connections: These trail miles <br />were identified as priority opportunities to <br />enhance pedestrian and bicycle connections. <br />• The Proposed Golden Loop Trail: The Golden <br />Loop bike trail is an approximately 17-mile <br />multiuse corridor, providing residents with <br />increased bicycle and pedestrian access to parks. <br />Key Findings and Needs <br />• Santa Ana has one existing off-street trail, <br />limiting trail use. <br />• Approximately 4.5 trail miles still need to be <br />developed to complete the Golden Loop. <br />• Approximately 20.6 trail miles need to be <br />developed to provide Key Connections within <br />the city's park system, also connecting to the <br />Golden Loop. <br />• Multi -use trails are needed to improve park <br />access and non -motorized transportation. <br />• The City's focus on Class I trails is a key part of <br />the Santa Ana's broader bikeway system, with on - <br />and off-street bike trails and routes developed in <br />conjunction with transportation improvements. <br />• Additional recreational trails in parks, such as <br />soft -surfaced mountain bike loops, nature trails, <br />and jogging trails, as well as hard -surfaced <br />accessible walking trails and paths, would also <br />expand trail opportunities. <br />• Safe bike and pedestrian routes to parks would <br />help improve park access. <br />14-62 <br />GARDEN &OVE <br />5 <br />i am na <br />w�SiMlusrEr+� Em" ' � <br />H�i jaPt� G <br />ttrr Anqa Pgl <br />rJ <br />`TrdAHe�twor�k r �l � <br />I . <br />Lonneccl0n <br />RgionA Park <br />Centen <br />F <br />,�... w, ' i r' Adams Pa:k <br />.:FS. <br />I r ff f i <br />I <br />i <br />'Pro <br />+ M,n a• a <br />'aiNY,.•4LA..�raf .Zj. <br />J <br />McPark <br />G <br />fff/// <br />�yger <br />Triangle <br />or� <br />Park <br />A �Lll�a � <br />n �� <br />ROa ko al <br />�Sand�incc ,�' <br />RRi <br />��• <br />MAP 4-4: TRAIL CORRIDORS AND KEY CONNECTIONS <br />Exisdng Trail Corridors <br />Q Santiago Creek Bike Trail <br />vacMK Electric (Maple S;i Bike la I <br />MWA tOw BAe frad <br />Raimis e 04Trail <br />i� WrSi81kTrill <br />maddia Bike Trail <br />(Gj Same Ana RWr 014 Trill <br />II (Ipwer $feel BFk2Trall <br />Sam Ana Gardens 80TraB <br />Legend <br />-�•��dbr+Bir <br />44dnrryaatMdkydPe <br />r CIIyAVdBPajR <br />M PG�kr[ Party <br />commkimypark <br />lubuiPl.ua <br />(� Neighb]rhd°d Park <br />5peda1 Ule i <br />AiIii <br />r Major Recreation <br />Pam Resource <br />-Try <br />unddeloped 41are <br />i jdlnt,ow, School Sltr <br />r�: o aAa�v�'ApSaM <br />Gqu'arkres m14Nrrrvniwxn andAgrkrwxr+an <br />i and radliti4s Prwul2d try iXhers <br />ka <br />[{agai BM Trails <br />— Mapar Roaua , ko".s <br />m Oas. N pro[etLed i <br />- - Rall LIne1A{euu fta► <br />� rev Connecrlgr�s <br />_ Ciry of $dnLaa4ld. _... <br />__..,-"-._.. ,._.. <br />�• Proposed Golden LOOP <br />5/17/2022 <br />, •••• P�Lyre AIIVPment ni pC ScrttK Car <br />SANTA ANA PARKS MASTER PLAN CHAPTER 4: PARK ACCESS, EQUITY AND OPPORTUNITIES <br />