My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
OLEA EDGE ANALYTICS
Clerk
>
Contracts / Agreements
>
O
>
OLEA EDGE ANALYTICS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2022 4:08:50 PM
Creation date
5/17/2022 4:07:24 PM
Metadata
Fields
Template:
Contracts
Company Name
OLEA EDGE ANALYTICS
Contract #
N-2022-135
Agency
Public Works
Expiration Date
12/15/2022
Insurance Exp Date
1/1/1900
Destruction Year
2027
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: E724A90E-B947-453D-9D16-ABCDG20FBABD <br />PM8) Project Tracking of Meter Health Analytics Equipment Removal for Repairs and Reinstalls <br />PM9) Project Tracking of Increased Revenue for reporting to Utility <br />PROJECT SERVICES: <br />P1) Management Briefing Sheet with FAQ's and project goals. <br />P2) Site Survey Reports for Each Olea Meter Health Service Location. Reports include: <br />• Pictures of existing meter and vault conditions <br />• Assessment of safety protocol for installation activities <br />133) Olea Meter Installation and Removal Services <br />• Olea will provide all tools and equipment necessary to install MHA Equipment for each meter <br />selected <br />• Olea will coordinate with Utility staff for scheduling the date and time of meter installations <br />• Olea will be liable for any and all damage to Utility's meter and meter vault (if applicable) during <br />installation of MHA equipment <br />• This Scope includes one removal and one reinstallation for each meter location in order to facilitate <br />Utility's meter repairs at a given location. <br />• Upon completion of the Validation Period, Olea will uninstall and remove MHA Equipment from all <br />Utility meters, unless Utility notifies Olea it wishes to continue services by separate agreement. <br />Olea will patch any holes that have been drilled. <br />P4) Olea Meter Health Monitoring Services <br />• Olea will provide access and training to the Olea Analytics Utility Dashboard for use by up to 10 <br />unique users. <br />• Olea will establish the monitoring service at each location with daily communication. <br />• Olea will issue initial finding reports for each meter 14 days after the Olea Meter Health Equipment <br />has been installed, using a minimum of seven daysof metering information, unless Olea notifies client <br />that more time is needed for a specific issue. <br />• Olea will issue repair reports to Utility staff identifying meters in need of repair and specific repair <br />actions to be taken. <br />• Olea will coordinate with Utility to be onsite for initial meter repairs by the city to ensure that Olea's <br />meter analysis is interpreted correctly and to consult on meter repairs. <br />• Upon meter repair by Utility staff, Olea will validate that the repairs were completed as intended <br />within 15 days after the Olea Meter Health Equipment has been reinstalled, using a minimum of <br />seven days of metering information. <br />• On meters not requiring a repair, or in the monitoring phase of the Meter Health Monitoring Service, <br />Olea shall monitor the information from the meters. <br />P5) Repairs and/or Accuracy Validations <br />• The Utility is responsible for the meter repairs within© days following Olea's notification of a <br />required repair. <br />
The URL can be used to link to this page
Your browser does not support the video tag.