Laserfiche WebLink
Exhibit A <br />Bullying Prevention Advocacy <br />The teens will produce advocacy materials with limited input from the children they work <br />with during November and December camps only. Also, the teens will reduce the number <br />of resource tables they staff to about three per year, which may result in not all teens <br />staffing at least one event. The teens will not produce Bullying Prevention Videos and <br />they will not conduct Parent Training and Engagement as there will be insufficient time, <br />however the staff may conduct some of these activities if feasible. <br />Recognition <br />The end -of -summer community event will not be conducted because the program will not <br />allow for a full summer camp to be conducted. <br />Target Population <br />The target population will be reduced from a total of 85 participants, (25 teens/60 children) to <br />15 teens and 50 Children. A two-year grant period would have allowed for recruitment and <br />enrollment over time so that 85 participants could have been recruited. Each camp includes <br />duplicates from the camp before plus new recruits for an unduplicated final count. With just <br />one year, all recruitment will be done during a limited time thereby reducing the total number <br />that can be served. The target population will remain as originally indicated with participants <br />being Santa Ana residents who come from extremely and low-income households. <br />Innovation in Program/Service Delivery <br />The program will lose some of its innovative features due to the reduction from two years to <br />one year as there will be insufficient time for the teens to conduct all the work that had been <br />originally planned. Teens will still be trained and will use their skills to train and mentor <br />younger children but on a limited scale. <br />BUDGET PROPOSAL — REVISED <br />The budget has been revised to reflect the reduction in the number of participants to be <br />served and the reduction in activities that will be conducted, The cost of curriculum materials <br />has been reduced and the plan is to purchase only the fifth -grade materials, which staff can <br />use as a guide to develop curriculum activities for the lower grades. The staff costs will <br />remain the same as they will be needed to work on the curriculum and do some of the work <br />that the teens would have produced with the two-year plan. <br />21 <br />