My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PLACEWORKS, INC. (2)
Clerk
>
Contracts / Agreements
>
P
>
PLACEWORKS, INC. (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2023 2:17:16 PM
Creation date
6/7/2022 7:38:47 AM
Metadata
Fields
Template:
Contracts
Company Name
PLACEWORKS, INC.
Contract #
A-2020-241-33-02
Agency
Planning & Building
Council Approval Date
12/1/2020
Expiration Date
11/30/2023
Destruction Year
2028
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TASK 1 CONSULTATION CONCERNING RECIRCULATED DRAFT PEIR <br />The City's expanded public outreach and the previously prepared Draft and Final PEIRs refined the scope of the <br />Recirculated DEIR. This amendment requests the transferof remaining fees for this task to preparation of the <br />Recirculated DEIR (Task 2). <br />TASK 2 PREPARE SCREENCHECK DRAFT RECIRCULATED PEIR <br />This task is completed. Transfer of fees to cover the overage on this task is requested. As noted above, additional <br />effort was related to several factors. A greater level of analysis, documentation, and graphics was provided for <br />environmental justice issues and CalEnviroScreen (CES) information. The supplemental information was included in <br />the Environmental Setting, Air Quality, and Hazards sections. There were numerous iterations of policy and <br />implementation actions that required ongoing revisions throughout the document and in the Appendix. Finally, we <br />coordinated and included updates to the Alternatives, which included quantified traffic and noise impact <br />information (for the new alternative and previously evaluated alternatives). <br />TASK 3. PREPARE DRAFT RECIRCULATED PEIR <br />The Draft Recirculated PEIR was distributed for public review between August 6, 2021, and September 20, 2021. <br />This document only included the recirculated chapters of the EIR. Our original scope of work assumed that the City <br />would want a complete copy of the Draft PEIR to include the remaining chapters of the DEIR. At the time, it was <br />anticipated this would essentially be a word-processing exercise. The effort to update the entire EIR per project <br />updates (policy and implementation action updates that affected almost all the chapters) and all changes in <br />response to comments from both the original Final EIR and Recirculated EIR turned out to be immense and involved <br />all levels of our project team (project management, graphics, editing, and word-processing). We coordinated with <br />the City regarding our suggested formatting to color code various changes by the source —policy changes (original <br />vs. final EIR), responses to comments (original vs. Final EIR), mitigation updates, etc. This effort also included <br />updating the appendices and respective references. Transfer of additional fees to this task is required to address <br />budget exceedance related to finalizing the Draft Recirculated PEIR for public distribution and posting to the City's <br />website. This included coordination and related revisions/update to recreation facilities, including GIS team <br />mapping. <br />TASK 4. NOTICE OF AVAILABILITY/PUBLIC REVIEW <br />This task was completed under budget, and this amendment requests transferring the remaining fees to Task 2. <br />TASK 5. FINAL EIR AND RESPONSE TO COMMENTS <br />The scope of work for this task assumed a moderate level of comment on the Recirculated DEIR and noted that if a <br />greater level of comment than anticipated was received, a budget augment might be required. Although the number <br />of letters was not excessive, attorneys on behalf of the City of Tustin, Orange County Environmental Justice, and Rise <br />Up Willowick submitted long, complex letters. The Madison Park Neighborhood Association / UCI also sent very <br />technical comments. The assistance from B13K was very helpful to address specific court cases, but limited with respect <br />to specific CPU issues and technical comments on the EIR. The additional fees requested for this task also include <br />addressing the comments received at the Study Session, which were not in our original scope of work. <br />January 21, 2022 (updated 318122) 1 Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.