Laserfiche WebLink
CITY OF SANTA ANA FY 22/23CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />This project will provide for the removal of existing damaged <br />pavement and reconstruction with Portland Cement Concrete (PCC) <br />for alleys citywide. <br />PROJECT NEED: <br />The Citywide network of Portland Cement Concrete (PCC) and asphalt <br />alleys is in extreme state of deterioration with the presence of <br />numerous potholes, cracking, spalling, and uplifting. PCC pavement will <br />eliminate the drainage problems associated with the asphalt pavement <br />and provide a longer life for the alleys. <br />PROJECT TITLE: <br />Alley Improvement Program <br />PROJECT CATEGORY: <br />Street Improvements <br />Alley Rehabilitation <br />LOCATION MAP <br />CITYWIDE <br />AGENCY:DIVISION:CONTACT: <br />Public Works CIP Engineering Kenny Nguyen, Senior Civil Engineer <br />PROJECT COSTS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 <br />Construction 1,389,000 1,389,000 1,389,000 1,389,000 1,389,000 1,389,000 1,389,000 <br />Engineering 111,000 111,000 111,000 111,000 111,000 111,000 111,000 <br />TOTAL 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 <br />SOURCE OF FUNDS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 <br />GENERAL FUND 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 <br />TOTAL 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 <br />175/23/2022 <br />Planning Commission {{item.number}}–24