CITY OF SANTA ANA FY 22/23CIP
<br />CAPITAL IMPROVEMENT PROJECT WORKSHEET
<br />PROJECT DESCRIPTION:
<br />This project will provide for the removal of existing damaged
<br />pavement and reconstruction with Portland Cement Concrete (PCC)
<br />for alleys citywide.
<br />PROJECT NEED:
<br />The Citywide network of Portland Cement Concrete (PCC) and asphalt
<br />alleys is in extreme state of deterioration with the presence of
<br />numerous potholes, cracking, spalling, and uplifting. PCC pavement will
<br />eliminate the drainage problems associated with the asphalt pavement
<br />and provide a longer life for the alleys.
<br />PROJECT TITLE:
<br />Alley Improvement Program
<br />PROJECT CATEGORY:
<br />Street Improvements
<br />Alley Rehabilitation
<br />LOCATION MAP
<br />CITYWIDE
<br />AGENCY:DIVISION:CONTACT:
<br />Public Works CIP Engineering Kenny Nguyen, Senior Civil Engineer
<br />PROJECT COSTS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29
<br />Construction 1,389,000 1,389,000 1,389,000 1,389,000 1,389,000 1,389,000 1,389,000
<br />Engineering 111,000 111,000 111,000 111,000 111,000 111,000 111,000
<br />TOTAL 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000
<br />SOURCE OF FUNDS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29
<br />GENERAL FUND 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000
<br />TOTAL 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000