My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Packet_5-23-22
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2022
>
5-23-22
>
Packet_5-23-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2022 5:18:48 PM
Creation date
7/11/2022 5:17:56 PM
Metadata
Fields
Template:
PBA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA FY 22/23CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />The Bristol Street Improvements project was planned and designed <br />to incorporate complete street concepts with storm water quality <br />features. The improvements include widening of the street from four <br />lanes to six lanes, with bus turnouts, raised median, bike lanes, <br />enhanced storm drain system, and sound walls. The project also <br />brings native and organic landscaping that beautifies a fully <br />developed urban area. <br />PROJECT NEED: <br />Bristol Street from Warner Avenue to St. Andrew Place (Phase 4) is <br />part of the City's plan to widen Bristol Street from Warner Avenue to <br />Memory Lane, which was approved by City Council in 1990 and <br />reevaluated in 2015. Existing roadway has only 2 lanes in each <br />direction and is operating at a LOS F. This widening is needed to <br />improve traffic flow and create complete streets features. <br />PROJECT TITLE: <br />Bristol Street Improvements and <br />Widening: Phase 4 - Warner to Saint <br />Andrew <br />PROJECT CATEGORY: <br />Street Improvements <br />Street/Bridge Improvements & <br />Widening <br />LOCATION MAP <br />AGENCY:DIVISION:CONTACT: <br />Public Works CIP Engineering Sean Thomas, Senior Civil Engineer <br />PROJECT COSTS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 <br />Construction 671,470 ------ <br />TOTAL 671,470 ------ <br />SOURCE OF FUNDS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 <br />DAF: DA-IV 141,470 ------ <br />TSIA AREA F 530,000 ------ <br />TOTAL 671,470 ------ <br />185/23/2022 <br />Planning Commission {{item.number}}–25
The URL can be used to link to this page
Your browser does not support the video tag.