Laserfiche WebLink
City of Santa Ana <br /> <br />Mitigation Monitoring and Reporting Program <br /> <br /> <br />Metro East Mixed-Use Overlay District Expansion and Elan <br />Development Projects 2 August 2018 <br />ICF 00019.18 <br /> <br />Mitigation Monitoring and Reporting Program <br />Implementation Due to the program- and project-level components of this SEIR, the MMRP has been divided into two parts to address each component separately. The mitigation measures that pertain to implementation of the MEMU Overlay District Expansion and their methods of implementation are listed in Table 1. The mitigation measures, which include several mitigation measures from the program-level component, that pertain to the Elan Development Project are listed in Table 2. Certain inspections and reports may require preparation by qualified individuals, and these are specified as needed. The timing and method of verification for each measure are also specified. It should also be noted that where applicable, mitigation measures from the 2007 Final MEMU EIR were carried forward into this SEIR, and, for some impacts, new mitigation measures were developed (highlighted gray in the tables below). Mitigation measures carried forward from the 2007 Final MEMU EIR maintained their original numbering and naming convention from the MEMU EIR and begin with “MM-OZ” in this MMRP. <br />Project Contact Information <br />Lead Agency: City of Santa Ana, Planning and Building Agency 20 Civic Center Plaza, M20 Santa Ana, CA 92702 <br />Contact Person/Telephone: Ali Pezeshkpour, AICP, Senior Planner (714) 647-5882 <br />Apx-228 <br />6/27/2022 <br />Planning Commission 2 –388